Case Studies.

Our Case Study database tracks 18,927 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.

Filters
  • (2)
    • (2)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
  • View all 5 Technologies
  • (2)
  • (1)
  • (1)
  • (3)
  • (1)
  • (1)
  • (1)
  • (1)
  • (4)
Selected Filters
4 case studies
Zenon the Ideal Basis for An Ergonomic HMI
COPA-DATA
KHS develops and produces machines and equipment for filling and packaging in the drinks industry. Because drinks manufacturing, filling and packaging consist of a number of highly complex processes, the user-friendly and intuitive operation of equipment is increasingly gaining in significance. In order to design these processes as simple as possible for the user, KHS decided to introduce a uniform, transparent and standardized solution to the company. The HMI interface should meet the requirement for people with different qualifications and enable them to work on a standard platform.
World leading zenon technology at Vipoll (Slovenia)
COPA-DATA
Vipoll aims to consolidate its market position and break into new markets not only in Slovenia but also internationally. A brewing customer needed to access the entire data from a production line. It was necessary to visualize the whole line and also to collect all its data, record that data transparently and make the data available to business users. The main focus was to grab data according to Weihenstephan standards. The Weihenstephan standards define which production data should be recorded at a filling plant and specifies how that data should be transferred.
Enlightened energy efficiency at Zumtobel
COPA-DATA
Several years ago, Zumtobel started a new measurement project. The aim of this project was to profit financially through a sustained program of energy efficiency while simultaneously protecting the environment. Zumtobel was looking for a clear visualization solution well-suited to facility management. The aim was to measure not only energy data on electric meters, but to collect and save data from the whole facility for later analysis.
Industrial IoT @ Gorenjske Elektrarne
COPA-DATA
Managing remote power generation sites has its own particular challenges, not least in terms of the efficient monitoring of operations. Given the nature of its power sources, many of the company’s power generation sites are located in remote and difficult terrain. This can present challenges in terms of the monitoring and control of remote locations.

    Contact us

    Let's talk!

    * Required
    * Required
    * Required
    * Invalid email address
    By submitting this form, you agree that IoT ONE may contact you with insights and marketing messaging.
    No thanks, I don't want to receive any marketing emails from IoT ONE.
    Submit

    Thank you for your message!
    We will contact you soon.