Download PDF
adidas Group implements Manhattan solutions to support global distribution operations
Technology Category
- Functional Applications - Enterprise Resource Planning Systems (ERP)
- Functional Applications - Remote Monitoring & Control Systems
- Functional Applications - Warehouse Management Systems (WMS)
Applicable Industries
- Apparel
- Consumer Goods
- Retail
Applicable Functions
- Business Operation
- Logistics & Transportation
- Warehouse & Inventory Management
Use Cases
- Inventory Management
- Process Control & Optimization
- Supply Chain Visibility
- Warehouse Automation
Services
- Software Design & Engineering Services
- System Integration
- Training
The Challenge
The adidas Group, a global leader in the sporting goods industry, faced the challenge of improving its supply chain systems platform across all its brands. The company needed a solution that could handle the increased complexity of its global distribution network, manage labels of different brands, and address the many variables associated with the distribution of sporting goods on a global scale. The goal was to standardize the distribution systems model, enhance supply chain control and visibility, and improve inventory accuracy across its distribution centers in the USA, Europe, and Asia.
About The Customer
The adidas Group is a global leader in the sporting goods industry, offering a broad range of products across three core segments: adidas, Reebok, and TaylorMade-adidas Golf. Headquartered in Herzogenaurach, Germany, the company operates multiple distribution centers worldwide, including significant facilities in Spartanburg, South Carolina, USA; Manchester, United Kingdom; and Seoul, South Korea. The company is known for its innovative products and strong brand presence in the market. With a focus on enhancing its global distribution operations, the adidas Group aims to maintain its competitive edge and meet the growing demands of its diverse customer base.
The Solution
To address its supply chain challenges, the adidas Group selected Manhattan Associates' Distribution Management solutions for implementation at three strategic sites in the USA, Europe, and Asia. The company purchased several components of Manhattan’s Distribution Management suite, including Warehouse Management for Open Systems, Labour Management, Slotting Optimisation, and Supply Chain Intelligence. The project was managed by a combination of adidas Group’s internal team and consultants from Manhattan Associates, with coordination from the IT headquarters in Germany. The implementation involved integrating Manhattan Associates’ software with the control systems managing the on-site material handling equipment (MHE) at the highly automated distribution centers in the UK and USA. Despite the complexity, the implementations were completed on time, with only minor configuration changes needed during the live testing phase.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Fire Alarm System and Remote Monitoring Sytem
Fire alarm systems are essential in providing an early warning in the event of fire. They help to save lives and protect property whilst also fulfilling the needs of insurance companies and government departments.Fire alarm systems typically consist of several inter-linked components, such as smoke detectors, heat detector, carbon monoxide, manual call points, sounders, alarm and buzzer. The fire alarm system should give immediate information in order to prevent the fire spread and protect live and property.To get maximum protection a shoe manufacturer in Indonesia opted for a new fire alarm system to monitor 13 production sites spread over 160 hectars. Although the company had an existing fire alarm system, it could not be monitored remotely.It was essential that the new system would be able to be monitored from a central control room. It needed to be able to connect to the existing smoke detector and manual call point. Information should be easily collected and passed on to the Supervisory Control and Data Acquisition (SCADA) system. Furthermore, the system should have several features such as alarm management, auto reporting, being connected to many client computers without additional cost, and run 24/7 without fails. The company also needed a system which could be implemented without changing the architecture of the existing fire alarm system.
Case Study
IoT Applications and Upgrades in Textile Plant
At any given time, the textile company’s manufacturing facility has up to 2,000 textile carts in use. These carts are pushed from room to room, carrying materials or semi-finished products. Previously, a paper with a hand-written description was attached to each cart. This traditional method of processing made product tracking extremely difficult. Additionally, making sure that every cart of materials or semi-finished products went to its correct processing work station was also a problem. Therefore, the company desired an intelligent solution for tracking assets at their factories. They also wanted a solution that would help them collect process data so they could improve their manufacturing efficiency.
Case Study
Improving Vending Machine Profitability with the Internet of Things (IoT)
The vending industry is undergoing a sea change, taking advantage of new technologies to go beyond just delivering snacks to creating a new retail location. Intelligent vending machines can be found in many public locations as well as company facilities, selling different types of goods and services, including even computer accessories, gold bars, tickets, and office supplies. With increasing sophistication, they may also provide time- and location-based data pertaining to sales, inventory, and customer preferences. But at the end of the day, vending machine operators know greater profitability is driven by higher sales and lower operating costs.
Case Study
Improving Production Line Efficiency with Ethernet Micro RTU Controller
Moxa was asked to provide a connectivity solution for one of the world's leading cosmetics companies. This multinational corporation, with retail presence in 130 countries, 23 global braches, and over 66,000 employees, sought to improve the efficiency of their production process by migrating from manual monitoring to an automatic productivity monitoring system. The production line was being monitored by ABB Real-TPI, a factory information system that offers data collection and analysis to improve plant efficiency. Due to software limitations, the customer needed an OPC server and a corresponding I/O solution to collect data from additional sensor devices for the Real-TPI system. The goal is to enable the factory information system to more thoroughly collect data from every corner of the production line. This will improve its ability to measure Overall Equipment Effectiveness (OEE) and translate into increased production efficiencies. System Requirements • Instant status updates while still consuming minimal bandwidth to relieve strain on limited factory networks • Interoperable with ABB Real-TPI • Small form factor appropriate for deployment where space is scarce • Remote software management and configuration to simplify operations