Anglo American's Advanced Analytics Transformation with Alteryx
Technology Category
- Analytics & Modeling - Big Data Analytics
- Analytics & Modeling - Data-as-a-Service
Applicable Industries
- Metals
- Mining
Applicable Functions
- Quality Assurance
- Warehouse & Inventory Management
Use Cases
- Inventory Management
- Track & Trace of Assets
Services
- Data Science Services
- Training
The Challenge
Anglo American, one of the world's largest mining companies, found itself grappling with a complex data estate and an outdated database solution. The company uses a variety of systems and tools, which made working with data on a day-to-day basis challenging. The company needed to perform more frequent and detailed internal audits, ethical business conduct reviews, risk management activities, investigations, and more. However, the wide range of data sources and audits to produce, different data types, levels of granularity, and output formats often made bringing datasets together a challenge. Anglo American needed a solution that would allow the team to cleanse and match data more effectively, with automation to help analysts cover more scope than with manual audits.
About The Customer
Anglo American is one of the world's largest mining companies, with roots dating back to 1917. The company is a major producer of diamonds, copper, nickel, and other metals through sites across almost every continent. More than 40% of the few hundred tons of platinum produced yearly is mined by Anglo American. The company uses a variety of systems and tools for its operations, and over the years, it found itself with a complicated data estate and an outdated database solution. Anglo American needed to perform more frequent and detailed internal audits, ethical business conduct reviews, risk management activities, investigations, and more.
The Solution
Anglo American chose Alteryx as the best match for its skills and scalability needs. Alteryx’s low-code approach to building analytics functions meant the team could be trained on the fundamentals, without them having to learn a whole new coding language. Starting with a team of 13 volunteers, Alteryx Designer was implemented and work began on identifying the highest value domains to tackle. Data analytics for Anglo American’s business assurance function (ABAS) now runs entirely on Alteryx, with a Power BI integration that helps teams visualize audit outputs in a user-friendly way. Now, audit teams can cover more scope in less time and perform audit testing on entire populations instead of drawing samples, helping the organization move toward continuous assurance. Alteryx has enabled Anglo American to easily access and blend data in ways that just weren’t possible before.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Goldcorp: Internet of Things Enables the Mine of the Future
Goldcorp is committed to responsible mining practices and maintaining maximum safety for its workers. At the same time, the firm is constantly exploring ways to improve the efficiency of its operations, extend the life of its assets, and control costs. Goldcorp needed technology that can maximize production efficiency by tracking all mining operations, keep employees safe with remote operations and monitoring of hazardous work areas and control production costs through better asset and site management.
Case Study
KSP Steel Decentralized Control Room
While on-site in Pavlodar, Kazakhstan, the DAQRI team of Business Development and Solutions Architecture personnel worked closely with KSP Steel’s production leadership to understand the steel production process, operational challenges, and worker pain points.
Case Study
Bluescope Steel on Path to Digitally Transform Operations and IT
Increasing competition and fluctuations in the construction market prompted BlueScope Steel to look toward digital transformation of its four businesses, including modern core applications and IT infrastructure. BlueScope needed to modernize its infrastructure and adopt new technologies to improve operations and supply chain efficiency while maintaining and updating an aging application portfolio.
Case Study
RobotStudio Case Study: Benteler Automobiltechnik
Benteler has a small pipe business area for which they produce fuel lines and coolant lines made of aluminum for Porsche and other car manufacturers. One of the problems in production was that when Benteler added new products, production had too much downtime.
Case Study
Continuous Casting Machines in a Steel Factory
With a very broad range of applications, steel is an important material and has been developed into the most extensive alloy in the engineering world. Since delivering high quality is absolutely crucial for steel plants, ensuring maximum productivity and the best quality production are the keys to competitiveness in the steel industry. Additionally, working conditions in steel factories are not suitable for workers to stay in for long periods of time, so manufactures usually adopt various machines to complete the steel production processes. However, the precision of these machines is often overestimated and the lack of flexibility also makes supervisors unable to adjust operating procedures. A renowned steel factory in Asia planned to improve its Distributed Control System (DCS) of furnaces as well as addressing the problem of insufficient accuracy. However, most well-known international equipment suppliers can not provide a satisfactory solution and local maintenance because the project needed new technologies to more accurately control equipment operations. By implementing Advantech’s automated monitoring and control solution, steel factories can not only improve the manufacturing processes but can also allow users to add additional functions to the existing system so as to make sure the operation runs at high efficiency.
Case Study
Automated Predicitive Analytics For Steel/Metals Industry
Asset to be monitored: Wire Compactor that produces Steel RebarCustomer Faced The Following Challenges:Dependent upon machine uptime.Pressure cylinders within the compactor fail to control compression and speed causing problems in binding the coil.Equipment failure occurs in the final stage of production causing the entire line to stop, can you say bottleneck?Critical asset unequipped with sensors to produce data.