Download PDF
Continental's Vehicle Systems Development Accelerated by Wind River Compiler
Applicable Industries
- Automotive
- Renewable Energy
Applicable Functions
- Product Research & Development
- Quality Assurance
Use Cases
- Onsite Human Safety Management
- Time Sensitive Networking
The Challenge
Automotive supplier Continental was faced with the challenge of saving time, reducing costs, and standardizing the development process across its globally dispersed development sites. The company also had to meet the requirements of the functional safety standard ISO 26262. This necessitated a global effort to standardize the development process during every phase and at every geographic site, using common processes and tools. The challenge was not only to streamline and standardize the development process but also to ensure compliance with safety standards across all its development sites.
The Customer
Continental AG
About The Customer
Continental is a leading automotive supplier with a global presence. The company was looking to save time, cut costs, and standardize the development process at its globally dispersed development sites. It also needed to meet the requirements of the functional safety standard ISO 26262. The company has 48 development sites around the world, and the challenge was to standardize the development process during every phase and at every geographic site, using common processes and tools.
The Solution
Continental adopted the Wind River® Diab Compiler to address its challenges. This OS-agnostic tool suite provided Continental developers with a C/C++ compiler, an assembler, a linker, ANSI C and C++ libraries, and an instruction set simulator. This comprehensive tool suite was everything Continental needed to speed up development, ensure software quality, and standardize its global development data. Wind River rigorously tests each release of the suite to ensure functional safety standards throughout the development process and provides support to the customers who use it. By updating its tool suite with the Wind River® Diab Compiler, Continental was able to standardize tools and processes, thereby lowering its development costs significantly.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Remote Monitoring & Predictive Maintenance App for a Solar Energy System
The maintenance & tracking of various modules was an overhead for the customer due to the huge labor costs involved. Being an advanced solar solutions provider, they wanted to ensure early detection of issues and provide the best-in-class customer experience. Hence they wanted to automate the whole process.
Case Study
Vestas: Turning Climate into Capital with Big Data
Making wind a reliable source of energy depends greatly on the placement of the wind turbines used to produce electricity. Turbulence is a significant factor as it strains turbine components, making them more likely to fail. Vestas wanted to pinpoint the optimal location for wind turbines to maximize power generation and reduce energy costs.
Case Study
Siemens Wind Power
Wind provides clean, renewable energy. The core concept is simple: wind turbines spin blades to generate power. However, today's systems are anything but simple. Modern wind turbines have blades that sweep a 120 meter circle, cost more than 1 million dollars and generate multiple megawatts of power. Each turbine may include up to 1,000 sensors and actuators – integrating strain gages, bearing monitors and power conditioning technology. The turbine can control blade speed and power generation by altering the blade pitch and power extraction. Controlling the turbine is a sophisticated job requiring many cooperating processors closing high-speed loops and implementing intelligent monitoring and optimization algorithms. But the real challenge is integrating these turbines so that they work together. A wind farm may include hundreds of turbines. They are often installed in difficult-to-access locations at sea. The farm must implement a fundamentally and truly distributed control system. Like all power systems, the goal of the farm is to match generation to load. A farm with hundreds of turbines must optimize that load by balancing the loading and generation across a wide geography. Wind, of course, is dynamic. Almost every picture of a wind farm shows a calm sea and a setting sun. But things get challenging when a storm goes through the wind farm. In a storm, the control system must decide how to take energy out of gusts to generate constant power. It must intelligently balance load across many turbines. And a critical consideration is the loading and potential damage to a half-billion-dollar installed asset. This is no environment for a slow or undependable control system. Reliability and performance are crucial.
Case Study
Remote Monitoring and Control for a Windmill Generator
As concerns over global warming continue to grow, green technologies are becoming increasingly popular. Wind turbine companies provide an excellent alternative to burning fossil fuels by harnessing kinetic energy from the wind and converting it into electricity. A typical wind farm may include over 80 wind turbines so efficient and reliable networks to manage and control these installations are imperative. Each wind turbine includes a generator and a variety of serial components such as a water cooler, high voltage transformer, ultrasonic wind sensors, yaw gear, blade bearing, pitch cylinder, and hub controller. All of these components are controlled by a PLC and communicate with the ground host. Due to the total integration of these devices into an Ethernet network, one of our customers in the wind turbine industry needed a serial-to-Ethernet solution that can operate reliably for years without interruption.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).