Efficient Worldwide Collaboration through Central Database Access: A Case Study on OMICRON
Technology Category
- Application Infrastructure & Middleware - Database Management & Storage
- Infrastructure as a Service (IaaS) - Cloud Databases
Applicable Industries
- Electrical Grids
- Equipment & Machinery
Applicable Functions
- Maintenance
- Quality Assurance
Use Cases
- Experimentation Automation
- Virtual Training
Services
- System Integration
- Training
The Challenge
OMICRON, an Austrian company specializing in the development of innovative technologies for electrical power supply, was facing a significant challenge in managing its digital assets. The company had a vast archive of 100,000 digital assets, including pictures, videos, graphics, documents, and audio files. These assets were stored on a file server with a complex folder structure, making it difficult for employees to search and find the necessary assets. The system was particularly inefficient for the 50 creatives and another hundred local and international colleagues who were working with the database. The configuration of the database made searching and finding assets extremely difficult and inefficient. Additionally, the system required a significant amount of effort to train new employees. The need for a more efficient system led the Marketing team to initiate the purchase of a Digital Asset Management (DAM) system.
About The Customer
OMICRON is an Austrian company that develops innovative technologies for all areas of electrical power supply. The company focuses on electrical testing of medium- and high-voltage equipment, protection testing, and testing of digital switchgears. It also has a separate Cyber Security division. In addition to these, OMICRON offers consulting, commissioning, testing, diagnostics, and training services. Its customers include energy suppliers, equipment manufacturers, large industrial companies, and service providers in the area of electrical engineering. Founded in 1984, the company now operates in 160 countries and employs around 920 people at 25 locations in Europe, North America, South America, Asia, Australia, and the Middle East.
The Solution
After evaluating various tools, OMICRON decided to implement the 4ALLPORTAL DAM system. The system was chosen for its modern interface, extensive product scope, and adaptability. The DAM system was designed to meet the needs of various stakeholders within the company, including Internal Communications, User Experience, Marketing, and Sales. For the IT department, it was crucial that the DAM standard was fully developed and update reliability was ensured. The system allowed all files to be stored in one central location that could be accessed via a web-based tool. The implementation of the DAM system took six months, after which training was provided to the employees. The system also included automatic keywording, which saved a lot of time. The DAM system also fostered collaboration through a 'traffic light' system that governed the rights to use the images.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.