Download PDF
Hyundai Heavy Industries: Becoming a world leader in the business of earth moving equipment
Technology Category
- Analytics & Modeling - Predictive Analytics
- Functional Applications - Product Lifecycle Management Systems (PLM)
- Platform as a Service (PaaS) - Data Management Platforms
Applicable Industries
- Construction & Infrastructure
- Equipment & Machinery
Applicable Functions
- Product Research & Development
- Quality Assurance
Use Cases
- Digital Twin
- Predictive Maintenance
- Remote Collaboration
Services
- Software Design & Engineering Services
- System Integration
The Challenge
HHI Construction Equipment (HCE) faced the challenge of becoming one of the top five worldwide suppliers of construction equipment by 2010. This was particularly difficult as the supply of construction equipment exceeded demand. To achieve this goal, HCE needed to bring new products to market quickly, which required optimizing the design process, integrating the entire product lifecycle, and improving collaboration between HCE and its suppliers. Additionally, HCE needed to enhance visualization for faster and more accurate validation of designs.
About The Customer
Hyundai Heavy Industries (HHI) is a Korean company that operates a global business network across six business divisions: Shipbuilding, Offshore & Engineering, Industrial Plant & Engineering, Engine & Machinery, Electro Electric Systems, and Construction Equipment. The Construction Equipment Division, which began operations in 1985, employs 1,200 people and has grown into a world-class producer of construction equipment. The division has developed 54 vehicle models, including excavators, wheel loaders, forklifts, and skid steer loaders. With a manufacturing capacity of 19,000 units a year at its Ulsan factory in Korea and additional plants in China, HHI markets its construction equipment through 436 authorized distributors in 92 countries.
The Solution
HHI Construction Equipment (HCE) implemented Siemens PLM Software technology to address its challenges. The solution included the integration of Siemens’ NX™ digital product development software and Teamcenter® digital lifecycle management software. A 16-member team, comprising half from HCE and half from Siemens PLM Software Korea, executed the implementation using the Teamcenter methodology. A six-month pilot project involving three models (an excavator, a wheel loader, and a forklift truck) was conducted to evaluate the new approach. The PLM technology was successfully implemented by the target date. The implementation included 110 licenses of NX and 250 of Teamcenter, enabling HCE to design vehicles in 3D, utilize existing CAD data, and perform early simulations of product performance. Teamcenter served as the backbone for global R&D collaboration, managing bills of material, engineering changes, and product variants.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.