Download PDF
Large Multinational Electric Utility Assures Smart Grid Data Transfer with Proactive Monitoring and Troubleshooting
Technology Category
- Analytics & Modeling - Real Time Analytics
- Networks & Connectivity - Network Management & Analysis Software
Applicable Industries
- Utilities
Applicable Functions
- Logistics & Transportation
- Quality Assurance
Use Cases
- Energy Management System
- Remote Asset Management
Services
- System Integration
- Testing & Certification
The Challenge
As part of the utility’s ongoing effort to improve the customer experience and drive greater efficiency, smart grid technology, including smart meters were being rolled out to all customers. Because smart meters must be able to transfer information to the smart grid data center effectively and efficiently, reliability and performance of the Automated Metering Infrastructure (AMI) is absolutely imperative. Slow connections were creating delays in data collection, which meant customers couldn’t get real-time meter information on their mobile app or web portal. As the utility plans to roll out more time-based services and variable billing, data performance will be vital. In order to meet the growing data demands of the business, the utility’s IT team faced the challenge of proactively monitoring and troubleshooting its networks. The existing solution, which was cumbersome and time-consuming, only provided reactive troubleshooting and had no ability to triage problems once intermittent symptoms ceased. IT needed the ability to perform forensics on past smart grid performance issues in order to determine the root cause after the fact, allowing them to make proactive corrections and prevent future problems. In addition, IT needed a solution to monitor and manage voice-over IP (VoIP) in the utility’s call centers for real-time issue discovery and problem solving.
About The Customer
This multinational electric utility is headquartered in Europe and services countries around the world, supplying electricity to more than 100 million customers. In addition to being a world leader in clean energy and fighting climate change, they are dedicated to digital transformation to provide better quality of service and more power options to meet the individual needs of customers, while providing more competitive pricing. Their customers and more than 20,000 employees depend on their advanced network and application services to be responsive and available. After all, there can be no ‘off’ when it comes to power companies!
The Solution
In order to ensure the successful rollout of its smart meters, the utility turned to NETSCOUT® to more effectively monitor the transfer of information from smart meters to the smart grid data center. NETSCOUT’s TruView solution was deployed to monitor data flows and ensure network availability and performance. Using TruView, the IT team was able to detect both latency and connection problems. This was important because some locations were high-speed with fiber connections and others were low-speed data networks. The NETSCOUT solution allowed IT to detect issues proactively and troubleshoot them both in real time and historically using the back-intime application. The back-in-time application allowed them to retrieve packet captures and conduct forensics to see what issues may have caused problems in the past, thereby solving ongoing and intermittent issues. TruView empowers IT to determine whether problems are related to a network issue or a protocol level issue on the smart data grid. The nGeniusONE Service Assurance platform with InfiniStream appliances was the solution of choice to achieve service assurance for VoIP in the contact centers. Wire-traffic was necessary for nGeniusONE to help pinpoint issues that could create a negative experience for their customers, including such things as dropped calls, connection delays and/or echo, to name a few. NETSCOUT Packet Flow Switches were used to feed data to TruView and the InfiniStream appliances.
Operational Impact
Related Case Studies.
Case Study
IoT Solutions for Smart City | Internet of Things Case Study
There were several challenges faced: It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance. The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.
Case Study
Automation of the Oguz-Gabala-Baku water pipeline, Azerbaijan
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”
Case Study
GPRS Mobile Network for Smart Metering
Around the world, the electricity supply industry is turning to ‘smart’ meters to lower costs, reduce emissions and improve the management of customer supplies. Smart meters collect detailed consumption information and using this feedback consumers can better understand their energy usage which in turn enables them to modify their consumption to save money and help to cut carbon emissions. A smart meter can be defined in many ways, but generally includes an element of two-way communication between the household meter and the utility provider to efficiently collect detailed energy usage data. Some implementations include consumer feedback beyond the energy bill to include online web data, SMS text messages or an information display in consumers’ premises. Providing a cost-effective, reliable communications mechanism is one of the most challenging aspects of a smart meter implementation. In New Zealand, the utilities have embraced smart metering and designed cost effective ways for it to be implemented. The New Zealand government has encouraged such a move to smart metering by ensuring the energy legislation is consistent with the delivery of benefits to the consumer while allowing innovation in this area. On the ground, AMS is a leader in the deployment of smart metering and associated services. Several of New Zealand’s energy retailers were looking for smart metering services for their residential and small business customers which will eventually account for over 500,000 meters when the multi-year national deployment program is concluded. To respond to these requirements, AMS needed to put together a solution that included data communications between each meter and the central data collection point and the solution proposed by Vodafone satisfied that requirement.
Case Study
NB-IoT connected smart meters to improve gas metering in Shenzhen
Shenzhen Gas has a large fleet of existing gas meters, which are installed in a variety of hard to reach locations, such as indoors and underground, meaning that existing communications networks have struggled to maintain connectivity with all meters. The meter success rate is low, data transmissions are so far unstable and power consumption is too high. Against this background, Shenzhen Gas, China Telecom, Huawei, and Goldcard have jointly trialed NB-IoT gas meters to try and solve some of the challenges that the industry faces with today’s smart gas meters.
Case Study
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs
Case Study
British Gas Modernizes its Operations with Innovative Smart Metering Deployment
The UK government has mandated that smart meters are rolled out as standard across Great Britain by end of 2020, and this roll-out is estimated to create £14 billion in net benefits to the UK in consumer energy savings and lower energy generation demand, according to the Oxford Economics report, “The Value of Smart Metering to Great Britain.” While smart-metering systems have been deployed in many countries, the roll-out in Great Britain is unique because it is led by energy retailers, who have responsibility for the Electricity and Gas meters. The decision to have a retailer-led roll out was made by DECC (Department of Energy and Climate Change) to improve customer experience and drive consumer benefits. It has also led to some unique system-level requirements to support the unique local regulatory model.