Download PDF
Paragon Transforms Transportation Planning for FFE
Technology Category
- Functional Applications - Fleet Management Systems (FMS)
- Functional Applications - Remote Monitoring & Control Systems
Applicable Industries
- Food & Beverage
- Transportation
Applicable Functions
- Logistics & Transportation
- Warehouse & Inventory Management
Use Cases
- Fleet Management
- Predictive Maintenance
- Supply Chain Visibility
Services
- Software Design & Engineering Services
- System Integration
The Challenge
Despite the size and complexity of the FFE food distribution operation, transportation planning was carried out manually by staff located at each of the fourteen FFE service centers. This meant the service centers had limited visibility of the whereabouts of the truck, trailer and driver resources as well as the arrival times of the line haul trucks. Although planners scheduled pickup and delivery slots, an unsatisfactory level of appointments failed to meet the promised windows. Missing appointment times resulted in a number of problems. FFE incurred penalty fees which unnecessarily increased transportation spend. A proportion of food items were destined for production usage, so a delayed delivery could result in problems further down the supply chain with food processing plants lacking the correct ingredients to make the end products. Finally most food items have expiration dates, so late deliveries Streamlining the planning process reduced the shelf life of customer products. As a result of these issues, customer service suffered and sales stagnated. FFE runs its line haul operation on a weekly schedule, picking up products from vendors at the end of the week, and making movements over the weekend. The freight is then delivered to end customers at the beginning of the week. While orders were accepted up until close of business on Thursday, staff in the service centers struggled to complete the planning process in a timely fashion, often resulting in schedules not being ready until Saturday or Sunday. FFE increasingly found itself subcontracting to other carriers to fill the gap when they did not have trucks positioned correctly, costing the company up to $400k per month.
About The Customer
Frozen Food Express (FFE) is one of the largest temperature-controlled LTL operators in the US. The company uses its fleet of 150 line haul trucks to transport food between its fourteen service centers. Chilled and frozen food is cross-docked on arrival and then stored in the DC. Items are subsequently delivered to end-customers by FFE’s pickup and delivery fleet of 660 delivery trucks. With more than 6,500 deliveries and collections each week, using a fleet of 1,150 refrigerated, dual-temperature trailers, operational efficiency is key to achieving efficient food distribution, maximum utilization of expensive assets and reliable customer service.
The Solution
Automating the planning process with Paragon’s routing and scheduling software has provided FFE with visibility of all line haul truck and trailer movements between the FFE service centers. The planning team now know when trucks are going to depart and return to each service center so can maximize utilization of their pickup and delivery trucks, provide more accurate information to their customers and generally manage their food distribution operation more efficiently. 'When we create a load, we select the time for pickup and delivery and that delivery time is planned so that every order on the truck will make their service objective. As a result, on-time deliveries have increased,' explains Walter Martz, Senior Analyst, FFE Transportation Services, Inc. 'Knowing where trucks are and who is available to deliver those loads has greatly added to the efficiency of our transportation operation. In the past, we had to subcontract to other carriers to haul our loads because we didn’t have enough trucks available. Paragon has helped us eliminate this expense while also removing the penalty fees for not meeting promised delivery windows. Together that is a saving of up to $400k each month.' An important benefit of the project was centralizing the transportation planning process. A dedicated team of three planners based in Lancaster is now responsible for planning all line haul operations, freeing up regional staff to focus on service center operations. Automating the planning process means that all orders are automatically loaded into Paragon from FFE’s Order Management System. This allows the planning team to review the latest plan daily rather than individuals across the service centers independently trying to find the time for planning.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
The Kellogg Company
Kellogg keeps a close eye on its trade spend, analyzing large volumes of data and running complex simulations to predict which promotional activities will be the most effective. Kellogg needed to decrease the trade spend but its traditional relational database on premises could not keep up with the pace of demand.
Case Study
Airport SCADA Systems Improve Service Levels
Modern airports are one of the busiest environments on Earth and rely on process automation equipment to ensure service operators achieve their KPIs. Increasingly airport SCADA systems are being used to control all aspects of the operation and associated facilities. This is because unplanned system downtime can cost dearly, both in terms of reduced revenues and the associated loss of customer satisfaction due to inevitable travel inconvenience and disruption.
Case Study
IoT-based Fleet Intelligence Innovation
Speed to market is precious for DRVR, a rapidly growing start-up company. With a business model dependent on reliable mobile data, managers were spending their lives trying to negotiate data roaming deals with mobile network operators in different countries. And, even then, service quality was a constant concern.
Case Study
HEINEKEN Uses the Cloud to Reach 10.5 Million Consumers
For 2012 campaign, the Bond promotion, it planned to launch the campaign at the same time everywhere on the planet. That created unprecedented challenges for HEINEKEN—nowhere more so than in its technology operation. The primary digital content for the campaign was a 100-megabyte movie that had to play flawlessly for millions of viewers worldwide. After all, Bond never fails. No one was going to tolerate a technology failure that might bruise his brand.Previously, HEINEKEN had supported digital media at its outsourced datacenter. But that datacenter lacked the computing resources HEINEKEN needed, and building them—especially to support peak traffic that would total millions of simultaneous hits—would have been both time-consuming and expensive. Nor would it have provided the geographic reach that HEINEKEN needed to minimize latency worldwide.
Case Study
Digitize Railway with Deutsche Bahn
To reduce maintenance costs and delay-causing failures for Deutsche Bahn. They need manual measurements by a position measurement system based on custom-made MEMS sensor clusters, which allow autonomous and continuous monitoring with wireless data transmission and long battery. They were looking for data pre-processing solution in the sensor and machine learning algorithms in the cloud so as to detect critical wear.
Case Study
Cold Chain Transportation and Refrigerated Fleet Management System
1) Create a digital connected transportation solution to retrofit cold chain trailers with real-time tracking and controls. 2) Prevent multi-million dollar losses due to theft or spoilage. 3) Deliver a digital chain-of-custody solution for door to door load monitoring and security. 4) Provide a trusted multi-fleet solution in a single application with granular data and access controls.