Download PDF
Pronto Gym Services: Enhancing Communication and Asset Management with BlueFolder
Technology Category
- Functional Applications - Computerized Maintenance Management Systems (CMMS)
- Functional Applications - Enterprise Asset Management Systems (EAM)
Applicable Industries
- Equipment & Machinery
- Telecommunications
Applicable Functions
- Maintenance
- Procurement
Use Cases
- Asset Lifecycle Management
- Track & Trace of Assets
The Challenge
Pronto Gym Services, a gym equipment repair company, faced a significant challenge in maintaining effective communication with its customers. The company's technicians, while skilled at repairing complex gym machines, often struggled with customer communication, leading to a lack of transparency that could potentially harm the company's reputation. Additionally, Pronto Gym needed a robust tool for asset management. The company had to maintain hundreds of different types of equipment and provide technicians with access to documentation and specifications based on serial numbers. The company president, Ron McDonnel, sought a solution that would simplify communication and asset management, allowing technicians to focus on their core competencies while ensuring customers received the updates they needed.
About The Customer
Pronto Gym Services is a gym equipment repair company founded in 2011 by company president Ron McDonnel. The company provides maintenance and repair services for fitness and gym equipment to commercial clients, including hotels, businesses, schools, and housing communities. Maintenance contracts make up about 75% of the company's business. Pronto Gym has grown consistently since its inception, reaching nearly $1 million in annual revenue, largely due to its loyal customer base. The company is known for its clear, timely communications and its ability to set up and manage an equipment maintenance program tailored to the needs of its clients.
The Solution
Pronto Gym found its solution in BlueFolder’s gym equipment service software. BlueFolder facilitated proactive communication and clear follow-through, setting Pronto Gym apart from its competitors. The software allowed users to set up work order templates, which technicians could fill in with details, making it easy to keep customers informed about the work done, findings, and any safety risks. BlueFolder also provided contract management alerts, notifying Pronto Gym when contracts were about to expire, ensuring a smooth continuation of equipment maintenance. The software was easy to use and customizable, allowing the company to track different data points such as IP addresses for internet-connected gym equipment. BlueFolder’s recurring work orders kept preventative maintenance schedules on track, and its attachments feature simplified warranty work and record-keeping.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.