Download PDF
Unifying Global Operations with Google Workspace: A Case Study on Standard Industries
Applicable Industries
- Buildings
- Equipment & Machinery
The Challenge
Standard Industries, a global industrial company with over 15,000 employees across 184 locations in 80 countries, was facing significant challenges in streamlining communications and collaboration. The company was struggling with the simple task of scheduling a senior leadership meeting, which required several executive assistants to coordinate over the phone to determine availability. Furthermore, the company was dealing with over 28 active directory environments and four different mail and collaboration platforms across the organization. The need for a single, unified collaboration tool that could be used across all their locations on four continents was evident.
The Customer
Standard Industries
About The Customer
Standard Industries is a global industrial company with a diverse portfolio of interests, including building materials, solar, aggregates, and related investment businesses. The company is the world's largest manufacturer of roofing and waterproofing materials. With a presence on four continents, Standard Industries operates in 80 countries and has over 15,000 employees across 184 locations. The company's global reach and diverse operations make it a complex organization with unique challenges in terms of communication and collaboration.
The Solution
To overcome these challenges, Standard Industries decided to partner with Maven Wave to migrate to Google Workspace. The migration process began on a small scale, initially moving only the company’s New York City office to Gmail and Google Calendar. With the guidance of Maven Wave in change management, the team gradually shifted the entire company to Google Workspace. This included the adoption of Google Drive, Docs, Sheets, and Slides. The focus was on the end-user, and efforts were made to facilitate a change in behavior in how employees conducted their day-to-day business. Transformation labs were conducted, where employees were gathered for 3-4 hours to focus on business processes and challenges. This approach helped identify the challenges employees had outside of the previous tools, and Google tools were then applied to solve these problems.
Operational Impact
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.