Case Studies.
Our Case Study database tracks 18,926 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.
-
(3)
- (2)
- (1)
-
(2)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (5)
Selected Filters
5 case studies
Temperature monitoring for vaccine fridges
Eseye
Dulas wanted a way to improve the reliability of the cold chain, facilitating maintenance and ensuring fewer vaccines are spoiled. Dulas wanted an M2M solution which would enable them to record and report the temperature inside vaccine refrigerators.
|
Eseye puts Airmax on Target for 15% Cost Reduction
Eseye
Airmax wanted a provider who would take complete responsibility of their connectivity, without restricting them to a single network. They wanted a simple solution along with assurance that they were getting the best value for money, customer care and network flexibility.
|
Improving connectivity to remote areas with Rennicks MTS
Eseye
Rennicks’ solutions experienced issues with communications in Scotland, where poor network coverage in remote locations was causing problems for some of its Variable Message Signs (VMS). Loss of connectivity meant more site visits had to be made to manually adjust signs, which was proving to be costly while the root cause of the problem was not being addressed.
|
Keeping Bernard Matthews Turkey Farms Warm This Christmas
Eseye
Baxi Commercial worked closely with Eseye and IO Controls to develop and implement the system control and remote monitoring solution. The area in which these Baxi Commercial boiler house systems were installed was challenging for Baxi Commercial to ensure reliable cellular connectivity. Baxi Commercial needed a reliable connectivity supplier.
|
Unite Set For 10% Energy Reduction Thanks To Eseye Shoebill
Eseye
Unite Students needed to find out where and when the most energy was being expended, so they could better devise strategies to reduce energy consumption. Key to this plan was a monitor that wasn’t intrusive to the business or the residents and that didn’t require releasing staff to take meter readings.
|