Case Studies.

Our Case Study database tracks 18,927 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.

Filters
  • (3)
    • (3)
    • (2)
    • (2)
    • (1)
    • View all
  • (3)
    • (3)
  • (3)
    • (3)
  • (2)
    • (2)
  • (2)
  • (1)
  • (3)
  • (3)
  • (3)
Selected Filters
3 case studies
Continuous condition monitoring pays off at a large power utility
Petasense
A large power utility in Hawaii was looking for more frequent condition monitoring on their Balance of Plant (BOP) generation assets. They had experienced significant equipment failures that occurred between their scheduled quarterly walkaround condition monitoring routes.
Wireless Predictive Maintenance to Fix a Dated Walk-Around Program
Petasense
C&W Services was using a manual condition monitoring program at one of its leading life sciences’ client up until last year. At best, data was collected manually every 30 days, even on the most critical machines, using a handheld data logger. After the data collection, all of the data analysis had to be outsourced to a third party for analysis. This approach has several limitations:1. Unplanned Downtime2. Shortage of Manpower3. Safety and Access to Machines4. Inconsistent Readings Collected by Manual Processes
Large-scale Implementation of Wireless Predictive Maintenance
Petasense
In 2016, Arizona Public Service (APS) decided to enter the California ISO (CAISO) market, which allows them to sell power into the California market. One of their key assets was Sundance, a 420 MW unmanned peaker plant located 50 miles outside Phoenix. The entry into the CA energy market meant that starts tripled and run hours doubled almost immediately at the plant. They started looking for wireless Predictive Maintenance (PdM) system because the running hours were typically when no one was on site, which meant that traditional forms of PdM were not possible. Typically, a specialist would collect vibration and other condition data on equipment, but it had to be taken during operation, and it was difficult to get personnel out to the site.“Reliability was foremost on our minds,” commented Don Lamontagne, Supervisor of Equipment Reliability Engineering. “We faced huge loss of potential revenue, as well as fines if we weren’t able to generate power when it’s needed.”

    Contact us

    Let's talk!

    * Required
    * Required
    * Required
    * Invalid email address
    By submitting this form, you agree that IoT ONE may contact you with insights and marketing messaging.
    No thanks, I don't want to receive any marketing emails from IoT ONE.
    Submit

    Thank you for your message!
    We will contact you soon.