Download PDF
Advantech SRP-FPV240 ThinManager® Solution, Greater Quality Assurance for Enhanced Productivity
Technology Category
- Platform as a Service (PaaS) - Data Management Platforms
- Application Infrastructure & Middleware - Data Exchange & Integration
Applicable Industries
- Pharmaceuticals
Applicable Functions
- Discrete Manufacturing
- Quality Assurance
Use Cases
- Predictive Maintenance
- Asset Health Management (AHM)
Services
- System Integration
The Challenge
The pharmaceutical industry is heavily regulated, and manufacturers must maintain strict quality controls to ensure the safety of their products. One producer of pharmaceutical packaging was experiencing the costs of outdated production processes firsthand. With four manufacturing sites to manage, corporate headquarters found the remote process increasingly unsustainable. The manufacturer required a means of centralizing the management of all process visualization applications so that key adjustments could be performed remotely at its headquarters, thus saving on the firm’s limited IT resources while still ensuring the required traceability and regulatory compliance.
About The Customer
The customer is a pharmaceutical primary packaging container manufacturer based in the USA. The company is regulated by the FDA and must adhere to strict regulations to ensure consumer safety. The manufacturer operates four manufacturing sites, which were previously managed remotely from the corporate headquarters. This process was becoming increasingly unsustainable due to the outdated production processes. The company needed a solution that would allow them to centralize the management of all process visualization applications, enabling them to make key adjustments remotely from the headquarters. This would not only save on the company's limited IT resources but also ensure the required traceability and regulatory compliance.
The Solution
Advantech’s SRP-FPV240 was developed based on thin client options that are fully compatible with Rockwell Automation’s innovative ThinManager® software. Through seamless integration with an existing MES and ERP, ThinManager allows users to manage all server applications and monitoring sessions from a single interface. With multi-monitor support, virtual screens, shadowing, session scaling, and screen tiling support, the software provides all the functions required to customize the presentation and visualization of data from multiple sources. ThinManager’s capabilities make Advantech’s SRP-FPV240 an optimal platform for the building of scalable data management systems within smart factories. It streamlines thin client workflows and reduces hardware operations. SRP-FPV240 extends thin-client functionality and facilitates greater vertical integration through centralized management and plug-and-play support that improves reliability, security, and maintenance effectiveness.
Operational Impact
Related Case Studies.
Case Study
Case Study: Pfizer
Pfizer’s high-performance computing software and systems for worldwide research and development support large-scale data analysis, research projects, clinical analytics, and modeling. Pfizer’s computing services are used across the spectrum of research and development efforts, from the deep biological understanding of disease to the design of safe, efficacious therapeutic agents.
Case Study
Fusion Middleware Integration on Cloud for Pharma Major
Customer wanted a real-time, seamless, cloud based integration between the existing on premise and cloud based application using SOA technology on Oracle Fusion Middleware Platform, a Contingent Worker Solution to collect, track, manage and report information for on-boarding, maintenance and off-boarding of contingent workers using a streamlined and Integrated business process, and streamlining of integration to the back-end systems and multiple SaaS applications.
Case Study
Process Control System Support
In many automated production facilities, changes are made to SIMATIC PCS 7 projects on a daily basis, with individual processes often optimised by multiple workers due to shift changes. Documentation is key here, as this keeps workers informed about why a change was made. Furthermore, SIMATIC PCS 7 installations are generally used in locations where documentation is required for audits and certification. The ability to track changes between two software projects is not only an invaluable aid during shift changes, but also when searching for errors or optimising a PCS 7 installation. Every change made to the system is labour-intensive and time-consuming. Moreover, there is also the risk that errors may occur. If a change is saved in the project, then the old version is lost unless a backup copy was created in advance. If no backup was created, it will no longer be possible to return to the previous state if and when programming errors occur. Each backup denotes a version used by the SIMATIC PCS 7 system to operate an installation. To correctly interpret a version, information is required on WHO changed WHAT, WHERE, WHEN and WHY: - Who created the version/who is responsible for the version? - Who released the version? - What was changed in the version i.e. in which block or module of the SIMATIC PCS 7 installation were the changes made? - When was the version created? Is this the latest version or is there a more recent version? - Why were the changes made to the version? If they are part of a regular maintenance cycle, then is the aim to fix an error or to improve production processes? - Is this particular version also the version currently being used in production? The fact that SIMATIC PCS 7 projects use extremely large quantities of data complicates the situation even further, and it can take a long time to load and save information as a result. Without a sustainable strategy for operating a SIMATIC PCS 7 installation, searching for the right software version can become extremely time-consuming and the installation may run inefficiently as a result.
Case Study
Drug Maker Takes the Right Prescription
China Pharm decided to build a cloud-based platform to support the requirements of IT planning for the next five to ten years which includes a dynamic and scalable mail resource pool platform. The platform needed to have the following functions: all nodes support redundancy, ensuring service continuity and good user experience, simple and easy-to-use user interfaces for end users and administrators and good compatibility and supports smooth capacity expansion.
Case Study
ELI LILLY ADOPTS MICROMEDIA’S ALERT NOTIFICATION SYSTEM
Pharmaceutical production is subject to a strict set of enforced rules that must be adhered to and compliance to these standards is critically necessary. Due to the efforts of WIN 911’s strategic partner Micromedia, Lilly was able to adopt an alarm notification infrastructure that integrated smoothly with their existing workflows and emergency hardware and protocols. These raw energy sources enable the industrial process to function: electricity, WIN-911 Software | 4020 South Industrial Drive, Suite 120 | Austin, TX 78744 USA industrial steam, iced water, air mixtures of varying quality. Refrigeration towers, boilers and wastewater are monitored by ALERT. Eli Lilly identified 15000 potential variables, but limitations compelled them to chisel the variable list down to 300. This allowed all major alarms to be covered including pressure, discharge, quantity of waste water discharged,temperature, carbon dioxide content, oxygen & sulphur content, and the water’s pH.