Download PDF
Embracing Network Functions Virtualisation: A Competitive Edge for Datanet
Technology Category
- Networks & Connectivity - Ethernet
- Networks & Connectivity - Routers & Bridges
Applicable Industries
- Equipment & Machinery
- National Security & Defense
Applicable Functions
- Facility Management
Use Cases
- Construction Management
- Tamper Detection
Services
- Cloud Planning, Design & Implementation Services
- Hardware Design & Engineering Services
The Challenge
Datanet, a UK-based data hosting and connectivity services provider, was facing several challenges that necessitated a change in its data centre network. Firstly, the network equipment was nearing its end-of-life, raising concerns about its long-term viability. Given that Datanet's customers required highly reliable services with minimal downtime, a future-proofed and high availability network was essential. Secondly, as Datanet's services grew more successful and the volume of backup and recovery services increased, it needed to upgrade its network capacity from 1 Gbps to 10 Gbps to keep pace with traffic volumes. Upgrading the existing equipment would have required a substantial investment, almost equivalent to replacing it completely, prompting Datanet to look for alternative solutions. Lastly, Datanet had experienced a distributed denial of service (DDoS) attack that its previous vendor had struggled to deal with satisfactorily. It was keen to deploy comprehensive security throughout its new infrastructure as a fundamental design feature, rather than an add-on.
The Customer
Datanet
About The Customer
Datanet is a UK-based company that has been providing data hosting and connectivity services to businesses around London for 20 years, specialising in backup and recovery. The company was founded by Conleth McCallan, who recognised the need for hosted rack space that could provide a higher power allowance for customers. Many of Datanet's customers are specialist IT companies themselves, who select Datanet’s infrastructure to deliver their own services. Datanet is privately owned, with the head office and highly experienced staff operating from its own data centre in Fleet in the U.K., as well as two additional data centre facilities in London.
The Solution
Datanet decided to upgrade its network and went out to tender to find the optimum solution. One of its large customers recommended Juniper Networks equipment, and after further investigation, Datanet decided to use Juniper's technology for the upgrade project. The new data centre network was built using Juniper Networks MX104 3D Universal Edge Router to provide a data centre core, Juniper Networks EX4300 Ethernet Switch for aggregation, and Juniper Networks vSRX virtual firewall for customer security, all in a fully redundant configuration. The MX104 router is a modular, highly redundant SDN-ready router that offers 80 Gbps of capacity and supports a redundant control plane for high availability. The vSRX virtual firewall allowed Datanet to avoid deploying new hardware every time a new customer was provisioned, making the process more efficient. The entire network was simulated inside Datanet’s own data centre facilities to provide a proof-of-concept environment before it was migrated into live production.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.