Download PDF
Enhancing Pick-and-Place Robots with Annotations from Scale Rapid
Technology Category
- Analytics & Modeling - Machine Learning
- Sensors - GPS
Applicable Industries
- Cement
- E-Commerce
Applicable Functions
- Maintenance
- Quality Assurance
Use Cases
- Autonomous Robots
- Construction Management
Services
- System Integration
- Training
The Challenge
Ambi Robotics provides AI-powered robotic systems to customers, enabling them to scale their operations and handle increasing supply chain demand. The company's machine learning (ML) system is responsible for identifying an object and its location, and moving the robot hand to that location to grasp the object. The pick success rate, which is how often a robot successfully picks up an object, is the most important marker of success. However, Ambi Robotics faced a challenge in obtaining high-quality annotations for their data, which is crucial for improving their models. Initially, the company was managing the annotation process in-house, but this approach was not scalable for the amount of data they needed. When working with new clients and locations, Ambi Robotics would sometimes see lower pick-and-place success rates, simply because the environment looked different. The best way to improve performance was to mine data from the new location, annotate it, and then retrain their ML model. However, the company lacked the infrastructure to process this large quantity of data on a recurring basis.
About The Customer
Ambi Robotics is a company that provides customers with AI-powered robotic systems that empower them to scale their operations and handle increasing supply chain demand. Their technology is used in logistical warehouses across the e-commerce industry to automate the process of picking up packages, scanning their barcodes, and sending them to the correct location. The company's machine learning (ML) system is responsible for not just identifying an object and its location, but also for moving the robot hand to that location to grasp the object. For these customers, pick success rate – how often a robot successfully picks up an object – is the most important marker of success.
The Solution
Ambi Robotics partnered with Scale Rapid to outsource the data annotation process, enabling them to quickly obtain the annotations they needed to improve their ML models. Scale Rapid offers a simple step-by-step approach for setting up the annotation process, making it easy for customers to set up a new task in just minutes. To provide high-quality data, Scale Rapid builds quality evaluation into their pipeline through batch annotation. They produce a calibration dataset to identify gaps in the labeling instructions, until the customer is satisfied with the data calibration. After calibration is complete, Scale Rapid produces a production batch for the client. Scale Rapid has also provided Ambi Robotics with a reduction in lead time. While Ambi Robotics’ internal annotation process could sometimes take weeks, Scale Rapid consistently delivers production-ready results within 1-2 days. The results delivered by Scale Rapid are consistently on-level with their in-house annotation, while being produced using robust and scalable infrastructure.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Digital Transformation of Atlanta Grout & Tile: An IoT Case Study
Atlanta Grout & Tile, a Tile, Stone & Grout restoration company based in Woodstock, Georgia, was facing challenges with its traditional business model. Despite steady growth over the years, the company was falling behind the web revolution and missing out on the opportunity to tap into a new consumer base. They were using independent software from different vendors for each of their department information and workforce management. This resulted in a lot of manual work on excel and the need to export/import data between different systems. This not only increased overhead costs but also slowed down their response to clients. The company also had to prepare numerous reports manually and lacked access to customer trends for effective business decision-making.
Case Study
Revolutionizing Construction Equipment Rental: A Case Study on ProsRent and ENO8
ProsRent, a startup that won the 'Best Financial Opportunity' and 'Best Pitch' at CodeLaunch 2016, aimed to revolutionize the way construction professionals source and rent heavy equipment. In the construction industry, project managers and contractors typically rent heavy equipment from supply companies. However, predicting inventory can be challenging, and finding the required equipment at the right time and place can be a hassle. If the preferred vendor doesn't have the required equipment, it results in wasted time and money in searching for it, often leading to higher costs due to non-preferred rates and increased delivery costs if the vendor is located far from the job site. Suppliers, on the other hand, desired access to a wider base of trusted renters that they didn't have to vet themselves and wanted to offer dynamic rental pricing based on demand and availability in their market. ProsRent's challenge was to produce a minimum viable product that was fast and first to market but also strong enough to engender loyalty and repeat business from the target market.
Case Study
IoT Solution Enhances Comfort and Energy Efficiency at Apple Valley Commons Office
Apple Valley Commons, a mixed-use office complex built in 1986, was facing significant comfort and energy efficiency challenges. The building, which houses a variety of businesses, was experiencing extreme temperature imbalances, causing discomfort to employees and clients. Despite outdoor temperatures being consistently high during summers, occupants had to use space heaters to keep warm. The electricity bills from the constant operation of the heat pump were exorbitant. The building's elevator room on the roof was also overheating, reaching temperatures of 130 to 140 degrees, causing the elevator equipment to shut down. The building's existing controls solution did not provide a front end for diagnostics or remote control. The building management was seeking a solution that could address these temperature issues, improve occupant comfort, reduce operational costs, and increase building visibility.
Case Study
Revamping EE's Legacy ERP: A Case Study on BT's Strategic Transformation
EE, even after its merger with BT, was operating its ERP estate on legacy infrastructure, hosted on the premises of a third-party supplier. This outdated system resulted in a volume-based operational model, higher time to market, longer delivery cycles, and unsatisfactory customer experience. BT recognized the need for a strategic transformation of these aging ERP systems and sought a partner who could proactively manage application services. The partner was also expected to handle development requirements associated with application management services, drive accountability, and ownership with a time and target-driven transformation of these services. BT's primary goals were to improve customer experience, reduce cycle time, and measure these improvements with precision.