Download PDF
Fivetran and Hightouch: Powering Nando’s Data-Driven Growth
Technology Category
- Functional Applications - Warehouse Management Systems (WMS)
- Platform as a Service (PaaS) - Application Development Platforms
Applicable Industries
- Cement
- Construction & Infrastructure
Applicable Functions
- Sales & Marketing
- Warehouse & Inventory Management
Use Cases
- Construction Management
- Picking, Sorting & Positioning
Services
- Cloud Planning, Design & Implementation Services
- System Integration
The Challenge
Nando’s, a popular fast-food chain known for its flame-grilled peri-peri style chicken, was facing a significant challenge with its existing infrastructure. The company, which operates over 1,200 outlets in 30 countries, was struggling to meet the demands of its data-driven marketing strategies, particularly around customer loyalty and rewards programs. The existing infrastructure was slow and inflexible, making it difficult for the data team to effectively manage data pipelines and make informed business decisions. The team, led by Miquel Puig, Technical Lead on the Engineering team, was manually working on data pipelines and making business decisions based on data at the ingestion stage. One of the key use cases was turning end-of-day data from the outlets into insights that informed loyalty and reward programs.
About The Customer
Nando’s is a globally recognized fast-food chain famous for its flame-grilled peri-peri style chicken. The company operates over 1,200 outlets in 30 countries, with more than 450 outlets across the United Kingdom and Ireland. Nando’s serves 12 million customers and aims to continually improve and serve them better by becoming data-driven in the UK & IRE. The company has built its success on providing customers with a great dining experience and aims to continue this mission by using data to better communicate with customers. The data team at Nando’s, responsible for ensuring the infrastructure can support data-driven marketing strategies, consists of three analysts, two data engineers, a product manager, and a platform manager.
The Solution
To overcome these challenges, Nando’s decided to overhaul its existing infrastructure. The company moved its data from SQL server to Google Cloud Platform, choosing BigQuery as the data warehouse at the center of a modern data stack. Fivetran was selected as the data source connector, alongside Google Cloud Resources, Looker for BI, and Hightouch as the Reverse ETL and data activation solution. The goal was to create an infrastructure that provided flexibility and visibility, giving the business a transparent view of data that it could trust. Fivetran was chosen over Stitch for data integration due to its flexibility, ease of use, and speed. Hightouch was selected for its clear UX and superior integrations with Nando’s marketing stack, allowing the company to send a 360 view of customers to the campaign tool and ad networks like Facebook and Google Ads for personalized campaigns.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.