Download PDF
HARTMANN's Global Network Stabilization and Security Enhancement with Infoblox
Technology Category
- Cybersecurity & Privacy - Malware Protection
- Platform as a Service (PaaS) - Device Management Platforms
Applicable Industries
- Construction & Infrastructure
- National Security & Defense
Use Cases
- Construction Management
- Tamper Detection
Services
- Cloud Planning, Design & Implementation Services
- System Integration
The Challenge
HARTMANN, a global leader in medical device manufacturing, operates in over 35 markets worldwide. The company faced the challenge of maintaining a uniform and organized IT infrastructure across its vast facilities and workforce. The user experience for HARTMANN executives and staff, whether in Heidenheim, Germany or Shanghai, China, needed to be of identical quality. To prevent local differences, HARTMANN decided to harmonize its IT infrastructure, which had been managed locally. However, the implementation with Microsoft DNS and DHCP solutions left the company unsatisfied over time. The problem was that the implementation was dependent on individual sites, limiting visibility into network operations. The data was outdated, and performing system analyses was a slow, time-consuming process. Furthermore, it wasn’t possible to integrate a backup concept with modern DHCP.
The Customer
HARTMANN
About The Customer
HARTMANN is a long-established leader in medical device manufacturing with a global presence. The company has subsidiaries and production sites in every region, operating in over 35 markets around the world. With a sprawling facilities footprint and a worldwide workforce, HARTMANN's operations are vast and complex. The company's IT infrastructure is critical to its operations, requiring a uniform and organized system that can deliver a consistent user experience for HARTMANN executives and staff, regardless of their location. The company's complex branching structure and the need for secure and stable IT operations make it a demanding customer for network management and security solutions.
The Solution
HARTMANN turned to Infoblox for a comprehensive DDI solution, consisting of DNS (Domain Name System), DHCP (Dynamic Host Configuration Protocol), and IPAM (IP Address Management). When HARTMANN's data center in Heidenheim reached its end-of-life in 2019, the decision was made to build a new state-of-the-art center in Frankfurt. The network team realized that the entire Infoblox DHCP IPAM configuration should be reconstructed there too. HARTMANN took an all-or-nothing approach and decided to use this opportunity to implement Infoblox DNS services as well. HARTMANN also adopted Infoblox’s BloxOne Threat Defense security solution to protect its existing networks, the cloud, and Internet-of-Things applications and appliances, as well as the company’s SD-WAN. The solution automates security measures by comprehensively integrating the entire security ecosystem, providing clear, real-time visibility into all network operations.
Operational Impact
Related Case Studies.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.
Case Study
Condition Based Monitoring for Industrial Systems
A large construction aggregate plant operates 10 high horsepower Secondary Crusher Drive Motors and associated conveyor belts, producing 600 tons of product per hour. All heavy equipment requires maintenance, but the aggregate producer’s costs were greatly magnified any time that the necessary maintenance was unplanned and unscheduled. The product must be supplied to the customers on a tight time schedule to fulfill contracts, avoid penalties, and prevent the loss of future business. Furthermore, a sudden failure in one of the drive motors would cause rock to pile up in unwanted locations, extending the downtime and increasing the costs.Clearly, preventative maintenance was preferable to unexpected failures. So, twice each year, the company brought in an outside vendor to attach sensors to the motors, do vibration studies, measure bearing temperatures and attempt to assess the health of the motors. But that wasn’t enough. Unexpected breakdowns continued to occur. The aggregate producer decided to upgrade to a Condition Based Monitoring (CBM) sensor system that could continually monitor the motors in real time, apply data analytics to detect changes in motor behavior before they developed into major problems, and alert maintenance staff via email or text, anywhere they happened to be.A wired sensor network would have been cost prohibitive. An aggregate plant has numerous heavy vehicles moving around, so any cabling would have to be protected. But the plant covers 400 acres, and the cable would have to be trenched to numerous locations. Cable wasn’t going to work. The aggregate producer needed a wireless solution.