Download PDF
HyperWorks at Wagon Automotive: Accelerating Product Development and Reducing Prototype Costs
Technology Category
- Analytics & Modeling - Digital Twin / Simulation
Applicable Industries
- Automotive
- Equipment & Machinery
Applicable Functions
- Product Research & Development
- Quality Assurance
Use Cases
- Virtual Prototyping & Product Testing
- Virtual Reality
Services
- Hardware Design & Engineering Services
- Testing & Certification
The Challenge
Wagon Automotive, a Germany-based system and module supplier of components to major car builders, was facing the challenge of accelerating product development and reducing prototyping costs while maintaining high quality. The company operates in a demanding, time-sensitive market, supplying components to an impressive list of customers that includes VW, Audi, GM, Toyota, Mercedes, Honda, Volvo, Ford, Jaguar, and Porsche. With development and production sites in Europe, Asia, and North America, 7,600 Wagon Automotive employees are engaged in the design, testing, and manufacture of components that must meet precise production deadlines. The rapidly changing nature of the global industry demands ever-shorter product development cycles from Wagon Automotive engineers. To sustain its strong competitive position and keep its customers satisfied, Wagon Automotive was seeking ways to speed up product development and reduce the growing costs of prototyping.
About The Customer
Wagon Automotive is a Germany-based system and module supplier of components to major car builders. The company develops and builds systems and modules — doors, structural members, window systems, and other essential pieces — for an impressive list of customers that includes VW, Audi, GM, Toyota, Mercedes, Honda, Volvo, Ford, Jaguar, and Porsche. At development and production sites in Europe, Asia, and North America, 7,600 Wagon Automotive employees are busy with the design, testing, and manufacture of components that must arrive at assembly plants to meet precise production deadlines. Products must be tailored to customers' needs. The rapidly changing nature of a global industry demands ever-shorter product development cycles from Wagon Automotive engineers.
The Solution
Wagon Automotive found the solution in Altair HyperWorks, a suite of advanced CAE tools. The company acquired 50 HyperWorks license units in 2000, after an intensive three-month benchmarking of various CAE software packages. Today, all CAE processes at Wagon Automotive GmbH, from modeling to optimization, are done using HyperWorks tools: HyperView, HyperStudy, HyperMesh, OptiStruct, and HyperForm. These advanced tools carry the pre- and post-processing and the simulation load, particularly for linear statics calculations, crash analysis, and structural optimization. Wagon Automotive uses HyperWorks for creating simulation models of doors and carrier modules like IP-cross members as well as for vibration and dimensioning calculations. The engineers also design front- and rear-crash management systems for repair load cases and high-speed conditions. Most models are small, but they may be recalculated many times during a single day.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.