Download PDF
Kyoto University's HPC Resources Power Japan's Research Community
Technology Category
- Analytics & Modeling - Machine Learning
- Infrastructure as a Service (IaaS) - Cloud Computing
Applicable Industries
- Electrical Grids
- Equipment & Machinery
Applicable Functions
- Product Research & Development
Use Cases
- Inventory Management
- Smart Campus
Services
- System Integration
The Challenge
Kyoto University, one of the largest and highest-ranked universities in Japan, has a mission to provide high-performance computing (HPC) tools for researchers all over the country. With over 200 teams and more than 1,600 users relying on its computing resources, the university supports research in a broad variety of areas including natural science, economics, space science, genetics, and civil engineering. However, the massive data growth and demand for computing power meant that HPC is always evolving, and Kyoto University’s Academic Center for Computing and Media Studies (ACCMS) needed to evolve with it. To elevate its HPC capabilities, the team commissioned Cray, a Hewlett Packard Enterprise company, to deliver three supercomputing systems. The workload management of these systems was orchestrated by Altair’s PBS Professional™, a part of the Altair PBS Works™ suite.
About The Customer
Kyoto University is one of the largest and highest-ranked universities in Japan, with a 150-year tradition of providing critical academic and scientific resources across Japan and worldwide. Its Academic Center for Computing and Media Studies (ACCMS) provides high-performance computing (HPC) tools for researchers all over the country. The university supports research in a broad variety of areas including natural science, economics, space science, genetics, and civil engineering. With over 200 teams and more than 1,600 users relying on its computing resources — around 60% outside university walls — Kyoto University has an important mission with global reach.
The Solution
The university's supercomputing capabilities were boosted when Cray installed the Cray® XC™ “Camphor 2” supercomputer and two Cray® CS™ systems, “Laurel 2” and “Cinnamon 2.” All three systems had PBS Professional installed and the university also added the Cray® DataWarp™ application I/O accelerator, with transparent cache mode integration by Altair. Camphor 2 includes the Cray-designed Aries™ interconnect and over five petaflops of peak performance. Customization and custom development were key features of the solution. Altair did custom coding to achieve service-level agreements (SLAs) and, after the supercomputing system was installed, developed a node allocator that worked in conjunction with the scheduler to find the best times and places to schedule jobs. The Kyoto University supercomputing ecosystem was built to handle a variety of workloads, many with memory-hungry operations and highly parallel vectorized codes.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.