Planned Maintenance for Power Generating Company
- Functional Applications - Remote Monitoring & Control Systems
- Sensors - Vibration Sensors
- Sensors - Voltage Sensors
- Utilities
- Maintenance
- Machine Condition Monitoring
Having no unplanned outages in multi-unit power plants throughout the late spring, the summer and the early fall months is challenging in the hot Texas weather. An unplanned outage during these months could mean having to purchase replacement power at spot market prices, which could be spiking during the outage. Knowing when and for how long to overload the equipment in power plants is a significant part of operating strategy. Operators need accurate estimates of motor driven pump and fan loading levels to determine operating limits.
NRG installed Veros ForeSight to continuously monitor ten motor driven centrifugal pumps and four motor driven fans in Unit 5 of the W.A. Parrish plant in Thompsons, Texas; a nine unit power plant southwest of Houston. The motors ranged in rating from 1,000 hp to 4,000 hp, with motor voltages rated at 4,160 V and 6,900 V. Total motor hp being monitored is 31,500 hp. After installing Veros ForeSight, the system detected a fault on a 4,160V, 1,000 hp motor driven Boiler Feedwater Booster Pump. NRG used handheld vibration monitors to corroborate the issue. The alarm thresholds for the ForeSight system were set at 2 mils of equivalent vibration. Within a couple of months, the vibration levels reached 3 mils, then 4 mils, and soon 9 mils. The weekly vibration routes tracked the ForeSight system trends. NRG used a planned shutdown to replace both the motor and the pump. The root cause was determined to be a broken bolt and loose motor base that had damaged both motor and pump.