Siemens Energy's Digital Transformation with Alteryx
Technology Category
- Analytics & Modeling - Data-as-a-Service
- Analytics & Modeling - Machine Learning
Applicable Industries
- Electrical Grids
- Utilities
Applicable Functions
- Procurement
- Quality Assurance
Use Cases
- Leasing Finance Automation
- Retail Store Automation
Services
- Data Science Services
- Testing & Certification
The Challenge
Siemens Energy, a global force in power generation and transmission, faced a significant data management challenge. The company's Transmission unit, with 36 geographically distributed factories, generated a vast amount of production, logistics management, and financial data. Each factory had its own database, adding to the complexity of data management. The company also had to pull information from various sources such as SAP, Salesforce, and Amazon Web Services. The organization was spending a significant amount of time consolidating data, checking its validity, and ensuring the proper functioning of formulas. The lack of data analytics and the complexity of data management prevented the organization from drawing full value from its data. The company needed a solution that would provide access and consolidation to gain full visibility into the company's data estate and automate the process to simplify it.
About The Customer
Siemens Energy is a global leader in power generation and transmission, renewable energy, and more. The company's Power Transmission business unit manufactures and supplies thousands of energy network components to a customer base that spans the world. The Transmission unit has 36 geographically distributed factories producing everything a power network needs to function effectively. This includes earthing switches, coils, circuit breakers, and more. The company also pulls information from various sources such as SAP, Salesforce, and Amazon Web Services. The company was facing a significant data management challenge due to the vast amount of data it generated and the complexity of its data sources.
The Solution
Siemens Energy turned to Alteryx, a data analytics platform, to address its data management challenges. The company started with a simple workflow to automate weekly tasks, such as creating and sending a cash-in report to internal stakeholders. The company then moved on to more complex processes, such as automating forecasting reports for up to 30 projects at a time. The workflows were fully customizable through Alteryx analytic app interfaces, allowing the whole team to easily adjust and consume the output for their own forecasts. Alteryx Designer enabled business users to build their own workflows and solutions at high speed based on their needs. In less than six months, the company was able to build over 350 workflows in Alteryx Designer, with at least another 200 use case ideas in the pipeline. The company also used Alteryx to automate processes that were previously dependent on individual attendance times or office hours.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
IoT Solutions for Smart City | Internet of Things Case Study
There were several challenges faced: It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance. The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.
Case Study
Automation of the Oguz-Gabala-Baku water pipeline, Azerbaijan
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”
Case Study
GPRS Mobile Network for Smart Metering
Around the world, the electricity supply industry is turning to ‘smart’ meters to lower costs, reduce emissions and improve the management of customer supplies. Smart meters collect detailed consumption information and using this feedback consumers can better understand their energy usage which in turn enables them to modify their consumption to save money and help to cut carbon emissions. A smart meter can be defined in many ways, but generally includes an element of two-way communication between the household meter and the utility provider to efficiently collect detailed energy usage data. Some implementations include consumer feedback beyond the energy bill to include online web data, SMS text messages or an information display in consumers’ premises. Providing a cost-effective, reliable communications mechanism is one of the most challenging aspects of a smart meter implementation. In New Zealand, the utilities have embraced smart metering and designed cost effective ways for it to be implemented. The New Zealand government has encouraged such a move to smart metering by ensuring the energy legislation is consistent with the delivery of benefits to the consumer while allowing innovation in this area. On the ground, AMS is a leader in the deployment of smart metering and associated services. Several of New Zealand’s energy retailers were looking for smart metering services for their residential and small business customers which will eventually account for over 500,000 meters when the multi-year national deployment program is concluded. To respond to these requirements, AMS needed to put together a solution that included data communications between each meter and the central data collection point and the solution proposed by Vodafone satisfied that requirement.
Case Study
NB-IoT connected smart meters to improve gas metering in Shenzhen
Shenzhen Gas has a large fleet of existing gas meters, which are installed in a variety of hard to reach locations, such as indoors and underground, meaning that existing communications networks have struggled to maintain connectivity with all meters. The meter success rate is low, data transmissions are so far unstable and power consumption is too high. Against this background, Shenzhen Gas, China Telecom, Huawei, and Goldcard have jointly trialed NB-IoT gas meters to try and solve some of the challenges that the industry faces with today’s smart gas meters.
Case Study
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs
Case Study
British Gas Modernizes its Operations with Innovative Smart Metering Deployment
The UK government has mandated that smart meters are rolled out as standard across Great Britain by end of 2020, and this roll-out is estimated to create £14 billion in net benefits to the UK in consumer energy savings and lower energy generation demand, according to the Oxford Economics report, “The Value of Smart Metering to Great Britain.” While smart-metering systems have been deployed in many countries, the roll-out in Great Britain is unique because it is led by energy retailers, who have responsibility for the Electricity and Gas meters. The decision to have a retailer-led roll out was made by DECC (Department of Energy and Climate Change) to improve customer experience and drive consumer benefits. It has also led to some unique system-level requirements to support the unique local regulatory model.