下载PDF
Accelerating Business Insights: Balluff's Transformation with IBM DB2 and FlashSystem Technologies
技术
- 应用基础设施与中间件 - 数据库管理和存储
- 基础设施即服务 (IaaS) - 私有云
适用行业
- 建筑与基础设施
- 电网
适用功能
- 维护
- 销售与市场营销
用例
- 拣选/分拣/定位
- 时间敏感网络
服务
- 云规划/设计/实施服务
- 系统集成
挑战
巴鲁夫是世界领先的传感器解决方案制造商,面临着数据量不断增长的挑战。该公司的销售和业务发展报告需要更长的时间来制作,并且计划在夜间运行的处理任务几乎要占用工作时间。这对信息可用性和应用程序性能产生了负面影响。该公司需要加快信息获取速度,以支持其销售和业务开发职能。巴鲁夫希望优化其整个 IT 环境,包括软件、服务器和存储,以提高其事务 SAP ERP 环境的性能并提高所有部门的业务用户的生产力。该公司还旨在通过更快、更准确的数据仓库业务分析功能来改善决策。
关于客户
Balluff GmbH 总部位于德国诺伊豪森,是一家家族企业,也是世界领先的传感器解决方案制造商。该公司在 50 个国家拥有约 2,750 名员工。巴鲁夫提供先进的技术、尖端的电子产品、针对特定应用的客户解决方案以及训练有素的服务人员。 2013年,公司年销售额达3.35亿欧元。巴鲁夫依靠 SAP 解决方案来管理业务,包括用于数据分析和报告的 SAP Business Warehouse。随着业务的增长,数据传输速度减慢,这可能导致做出错误的投资决策,并且无法向客户提供最佳服务。
解决方案
Balluff 实施了完整的 IBM 解决方案来运行其事务型 SAP ERP 和分析型 SAP Business Warehouse 应用程序。该解决方案包括 SAP Business Warehouse(配备 BLU Acceleration 的 IBM DB2)、配备 IBM POWER7+ 处理器的 IBM Power 750 服务器、与 IBM V5000 存储子系统和 IBM FlashSystem 840 相结合的 IBM System Storage SAN Volume Controller,以及用于快速备份和恢复的 IBM Tivoli Storage FlashCopy Manager。系统复制无需停机。该公司升级了其 SAP ERP 应用程序以及底层 IBM 服务器和存储基础设施,然后部署了带有 BLU Acceleration 软件的 IBM DB2 以加速其 SAP Business Warehouse 应用程序。该公司还部署了具有下一代 IBM 磁带解决方案和 IBM TS4500 磁带库的 IBM Tivoli Storage Manager,使用 LTO6 磁带驱动器为关键任务数据提供可靠的备份和恢复过程。
运营影响
数量效益
相关案例.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Hydro One Leads the Way In Smart Meter Development
In 2010, Ontario’s energy board mandated that time-of-use (TOU) pricing for consumers be available for all consumers on a regulated price plan. To meet this requirement, Hydro One needed to quickly deploy a smart meter and intelligent communications network solution to meet the provincial government’s requirement at a low cost. The network needed to cover Hydro One’s expansive service territory, which has a land mass twice the size of Texas, and its customers live in a mix of urban, rural, and remote areas, some places only accessible by air, rail, boat or snowmobile. Most importantly, the network needed to enable future enterprise-wide business efficiencies, modernization of distribution infrastructure and enhanced customer service. To meet these needs, Hydro One conceptualized an end-to-end solution leveraging open standards and Internet Protocols (IP) at all communication levels. The utility drew upon industry leaders like Trilliant to realize this vision.
Case Study
Selling more with Whirlpool
Whirlpool wanted to add connectivity to appliances and transform the company's relationship with customers. Traditionally, Whirlpool interaction with customers was limited to purchases made once every ten years. Connected washer and dryers provide exciting new features like remote management of start times and inter-machine communication.
Case Study
SAS® Analytics for IoT: Smart Grid
Companies face falling revenues, rising infrastructure costs, and increasing risk of outages caused by inconsistent energy production from renewable sources. Less money is coming in as more people and organizations take steps to curb their energy use. Utilities are paying more to maintain and build infrastructure due to increasing complexity, resulting from the rising number of intermittent and variable renewable energy sources connected in the distribution grid.