下载PDF
AI-Driven Cybersecurity Transformation at Confiar Financial Cooperative
技术
- 网络安全和隐私 - 入侵检测
- 网络安全和隐私 - 恶意软件保护
适用行业
- 设备与机械
- 国家安全与国防
用例
- 网络安全
- 篡改检测
服务
- 网络安全服务
挑战
作为一家合作金融机构,Confiar 认识到拥有强大的安全堆栈和保护其客户敏感数据的重要性。 The Cooperative 拥有一系列传统安全工具,包括防火墙、防病毒和电子邮件保护,但需要一种能够了解用户行为并抵御勒索软件等快速传播威胁的解决方案。
客户
康菲尔
关于客户
Confiar是一家哥伦比亚金融合作社,在全国设有 54 个办事处,包括波哥大和麦德林。该合作社成立于近 50 年前,以其在社会住房项目中的领导作用而闻名。
解决方案
Darktrace 在网络防御的每个阶段都增强并支持防御者。 Confiar 依靠 Darktrace Cyber AI Analyst 自动调查复杂的威胁,并在几秒钟内向安全团队提供关键细节。网络 AI 分析师将人类直觉与 AI 的速度和规模相结合,以比人类快 9 倍的速度调查事件。
Cyber AI Analyst 是通过观察 Darktrace 自己的世界级威胁猎手而构建的。它像人类一样对新出现的事件提出假设,然后根据对整个数字企业的理解进行测试,最终以机器速度得出可操作的结论。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.