下载PDF
Augmented Human Lab: Enhancing Science Education with Google Cloud
技术
- 分析与建模 - 机器学习
- 网络安全和隐私 - 云安全
适用行业
- 教育
- 设备与机械
适用功能
- 维护
- 产品研发
用例
- 现场人员安全管理
- 篡改检测
服务
- 云规划/设计/实施服务
- 数据科学服务
挑战
奥克兰生物工程研究所的增强人体实验室希望激发孩子们对科学的热情,并解决新西兰八年级学生对科学科目缺乏信心的问题。
关于客户
增强人类实验室是奥克兰生物工程研究所的一个研究中心。他们的目标是开发人机界面来改善生活并帮助残疾人。 Kiwrious 项目专门针对儿童,旨在激发对科学的好奇心和热情。
解决方案
该实验室开发了 Kiwrious 项目,该项目使用数字技术和 Google Cloud 解决方案,让科学对孩子来说变得有趣和令人兴奋。他们创建了一种带有插入式传感器的教育技术工具,可以捕捉环境现象,让孩子们自己进行发现。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.