下载PDF
Automating Invoice Creation and Reducing Manual Work: A Case Study on Covalence Coding Bootcamp
技术
- 应用基础设施与中间件 - 事件驱动型应用
适用行业
- 水泥
- 设备与机械
用例
- 时间敏感网络
挑战
Covalence 是一个编码训练营,需要随着招生人数的增长而扩展其流程。他们有一个繁琐的自定义后端,缺乏灵活性,并且需要大量的手动工作,例如创建发票和发送通知。
关于客户
Covalence 是一个编码训练营,提供全栈开发训练营和前端基础课程。自 2015 年以来,它们已从阿拉巴马州的 1 个地点发展到遍布东南部三个州的 5 个地点。
解决方案
Covalence 实施了 Zapier(一种应用程序自动化工具)来自动化其工作流程。他们使用 Zapier 的自动化工作流程(称为 Zaps)来连接各种工具并自动执行任务,例如创建 Quickbooks 发票、发送电子邮件通知和更新 CRM。他们还使用 Zapier 为 Calendly 事件发送 Slack 消息。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.