下载PDF
Avanza: Enhancing Collaboration and Leveraging APIs with Google Cloud
技术
- 分析与建模 - 机器学习
- 传感器 - 相机/视频系统
适用行业
- 设备与机械
- 零售
适用功能
- 人力资源
- 维护
用例
- 预测性维护
- 时间敏感网络
服务
- 云规划/设计/实施服务
- 培训
挑战
BPO 提供商 Avanza 面临的挑战是在竞争激烈且周期性的行业中保持高效和竞争力。他们需要改善员工之间的协作,并在其业务解决方案中利用机器学习和人工智能。
关于客户
Avanza 是西班牙领先的 BPO 提供商,业务遍及西班牙、葡萄牙和拉丁美洲,拥有 7,000 多名员工。他们为各行业的客户提供广泛的服务。
解决方案
Avanza 部署了 Google Workspace,以实现员工之间更好的协作和沟通。他们还实施了 Google Cloud AI 和机器学习 API,以自动化核心业务运营并提高效率。 Google Cloud 合作伙伴 Altostratus 在整个迁移过程中提供咨询、培训和支持。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.