下载PDF
Bridging the Gap Between Designers and Customers with IoT
技术
- 处理器与边缘智能 - 微控制器与印刷电路板 (PCB)
- 传感器 - 声学传感器
适用行业
- 电子产品
- 设备与机械
适用功能
- 产品研发
用例
- 添加剂制造
- 制造过程模拟
服务
- 云规划/设计/实施服务
- 硬件设计与工程服务
挑战
与客户沟通 PCB 设计通常具有挑战性,因为可视化电路板的开发可能有些深奥。向客户解释他们的项目正在进行中的位置同样具有挑战性,因为在开发周期中共享原理图和零件布局很困难。
关于客户
AW Audio 为从刚起步的设计公司到主要 AV 设备制造商的所有人提供服务。他们与那些只有想法和手头有原理图的客户合作。 Altium 365 帮助每个人(从客户到组件制造商)达成共识。
解决方案
AW Audio 的创始人兼所有者 Paul Payen de la Garanderie 使用 Altium Designer 和 Altium 365 云平台来应对这些挑战。 Altium Designer 使他能够管理电路板零件和库,并轻松找到来自不同供应商的特定零件。 Altium 365 使他能够跟踪原理图并向客户展示他们的项目进展情况,从而促进沟通并建立信任。
运营影响
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Remote Temperature Monitoring of Perishable Goods Saves Money
RMONI was facing temperature monitoring challenges in a cold chain business. A cold chain must be established and maintained to ensure goods have been properly refrigerated during every step of the process, making temperature monitoring a critical business function. Manual registration practice can be very costly, labor intensive and prone to mistakes.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.