下载PDF
Brnstrm: Revolutionizing Brainstorming with IoT
技术
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 水泥
- 设备与机械
适用功能
- 产品研发
- 质量保证
挑战
传统的头脑风暴会议经常面临许多挑战。它们很难促进,参与者常常感到没有准备好并有压力当场产生创意,而且群体动态可能会导致排斥感。随着远程工作变得越来越普遍,这些问题变得更加严重,使得确保头脑风暴会议取得有意义的成果变得更加困难。 Brnstrm 的创始人 Clement Duclos 认识到这些挑战,并寻求创建一个解决方案,帮助团队产生更高质量的想法并更有效地实现目标。
关于客户
Brnstrm 专为希望提高头脑风暴会议质量的创意和产品团队而设计。该平台对于远程工作的团队特别有用,因为它允许异步头脑风暴会议。鉴于创始人的背景和平台的性质,Brnstrm 的用户很可能是科技行业的专业人士。该平台也可能会吸引那些重视结构化、有组织的头脑风暴会议并正在寻找能够有效促进这一过程的工具的人。
解决方案
Brnstrm 是一款协作构思和头脑风暴工具,利用物联网帮助创意和产品团队产生高质量的创意。该平台帮助团队了解目标和用户见解、进行创造性思考并分享伟大的想法。组织者可以发起头脑风暴,指定目标,上传见解,然后与参与者分享独特的链接。然后,参与者可以通过专用界面来审查目标、查看见解、分享想法以及评论他人的想法。如果参与者遇到困难,可以使用一些工具来帮助他们进行创造性思考。该平台是使用 Bubble 构建的,这是一种无代码工具,使 Duclos 能够创建精美的、响应式的且功能齐全的 Web 应用程序。
运营影响
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.