挑战
Bruce Power operates the world’s largest nuclear generating facility and provides Ontario, Canada with roughly 30% of its electricity. The company’s site in Tiverton, Ontario is home to eight CANDU reactors — each capable of producing up to 800 megawatts. With the nuclear power industry struggling to balance rapidly increasing demand with the costs and safety measures required to support an aging equipment base, Bruce Power identified scheduled maintenance activities as a source for efficiency gains — enabling increased availability. Specifically, the company had more scheduled maintenance activities than capacity, resulting in delays.
关于客户
Bruce Power is a Canadian electricity company and operator of the world's largest nuclear generating facility. The company's site in Tiverton, Ontario houses eight CANDU reactors, each capable of producing up to 800 megawatts of power. This makes Bruce Power a significant contributor to Ontario's electricity supply, providing approximately 30% of the province's electricity. The company operates within the nuclear power industry, which is currently facing challenges in balancing increasing demand with the costs and safety measures required to maintain an aging equipment base.
解决方案
Bruce Power implemented Asset Performance Management (APM) from GE Digital, formerly known as Meridium Enterprise APM, to increase availability while maintaining high safety standards. The APM solution allowed Bruce Power to use a risk-based approach to determine optimal maintenance intervals for its assets. This continuous identification and implementation of maintenance-related work-process improvements enabled the company to increase the life of existing assets, improve plant reliability and availability, and increase the amount of power pumped into the grid.
运营影响
  • Increased the life of existing assets
  • Improved plant reliability and availability
  • Increased the amount of power pumped into the grid
数量效益
  • Invested over $200 million of private dollars into publicly owned reactors during three planned maintenance outages in 2014
  • One of its units surpassed 500 days of continuous operation
  • Providing over 15% of Ontario’s electricity

相关案例.

联系我们

欢迎与我们交流!

* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

Thank you for your message!
We will contact you soon.