下载PDF
Digital Transformation and Efficiency Enhancement at Roquette through Alteryx
技术
- 分析与建模 - 机器学习
- 传感器 - 液位传感器
适用行业
- 教育
- 设备与机械
适用功能
- 产品研发
- 质量保证
用例
- 现场人员安全管理
- 时间敏感网络
服务
- 数据科学服务
- 培训
挑战
罗盖特是植物原料领域的全球领导者,需要彻底改变其生产设施和工艺,以满足不断增长的市场需求。他们在处理和分析 250 个生产流程的大型数据集时面临挑战。
关于客户
罗盖特是创新植物原料领域的全球领导者,服务于食品、营养和健康市场。他们应对社会挑战,并利用其成分实现更健康的生活方式。 Roquette 的生产设施包括 25 个工业基地。
解决方案
Roquette 采用 Alteryx 来整合、处理和分析不同的数据源。这使他们能够获得有意义的见解并大规模做出战略决策。 Alteryx 还实现了数据准备自动化,减少了手动工作,并使所有员工能够应用分析方法。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.