下载PDF
Enterprise AI for HealthTech: Streamlining Supply Chain Operations
技术
- 分析与建模 - 机器学习
- 功能应用 - 库存管理系统
适用行业
- 教育
- 设备与机械
适用功能
- 物流运输
- 仓库和库存管理
用例
- 数字孪生
- 供应链可见性(SCV)
服务
- 数据科学服务
挑战
纵观其悠久的历史,该公司通过许多战略收购实现了有机增长。
IT 的高度复杂性阻碍了公司获得关键业务洞察力和回答问题的能力,例如
- 应该优先考虑哪些产品线/SKU 以帮助缩短交货时间?
- 零件或产品在供应链的哪个环节卡住了(即“惰性库存”)?
- 为了最大化每个产品线/SKU 的 OTIF,跨配送中心的最佳库存分配是什么?
虽然这些挑战在正常的业务过程中是显着的,但在 COVID-19 大流行高峰期它们成为关键问题。
客户
未披露
关于客户
该公司是全球健康科技的领导者,在全球超过 35 家工厂生产产品,并通过广泛的生产和配送中心网络向全球客户运送产品。
解决方案
C3 AI 团队首先针对公司呼吸机产品的库存可见性挑战。在短短 4 周内,C3 AI 为 HealthTech 公司为应对 COVID-19 大流行而向全球医院交付的 42 个关键呼吸机 SKU(库存单位)配置了 C3 AI 供应网络风险应用程序。
该团队首先在 C3 AI 供应链数字孪生上统一不同的供应链数据。利用统一的数据图像,C3 AI 团队在 C3 AI Supply Network Risk 应用程序上配置了五个仪表板,为最终用户提供整个供应链的全球实时视图。
C3 AI Supply Network Risk 与 HealthTech 公司和 C3 AI 的真正跨职能团队合作成功配置并部署到生产中。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.