下载PDF
实例探究 > GainSeeker Suite automates CMM data collection - reduces data collection time by 81%

GainSeeker Suite automates CMM data collection - reduces data collection time by 81%

技术
  • 分析与建模 - 预测分析
  • 功能应用 - 制造执行系统 (MES)
适用行业
  • 消费品
适用功能
  • 质量保证
  • 流程制造
用例
  • 预测性维护
  • 机器状态监测
  • 过程控制与优化
服务
  • 系统集成
  • 软件设计与工程服务
挑战
The Quality Manager at a privately-held injection molding company faced a critical issue: freeing staff from non-value-added data manipulation activities. The quality team inspected samples of complex products using a Coordinate Measuring Machine (CMM) and manually entered data into a statistics package for analysis. This process was time-consuming and error-prone, requiring a half-time job on each of two shifts. The company leadership aimed to redirect staff from these tasks to more productive activities by automating the data collection process, thereby reducing measurement errors and freeing up staff for more valuable work.
关于客户
Hertzler Systems has been a leader in Statistical Process Control (SPC) Software and Six Sigma for over twenty-five years. They provide the leading real-time data acquisition and analytics SPC software, the GainSeeker Suite. Hertzler Systems serves a diverse customer base, including BAE Systems, Crown Audio, McCormick & Company, Inc., Hormel Foods Corporation, Snyders of Hanover, Titleist & Footjoy, IDEX Corporation, and TaylorMade-Adidas Golf Worldwide. Their software and services enable clients to connect, collect, analyze, and visualize data, building a data infrastructure for making data-driven decisions. These capabilities help clients improve throughput and yield, improve cycle times, reduce costs and errors, and increase profitability.
解决方案
Hertzler Systems set up a process to automatically extract and analyze critical inspection data directly from the CMM. The system automatically evaluates new data for stability and notifies key personnel of any out-of-control situations. This automation significantly reduced the time required to collect and analyze data, from four hours per shift to less than 45 minutes, an 81% reduction. The Quality Manager believes this time will decrease even further as users become more familiar with the process. The automation also eliminated typographical errors common in the manual process, increasing the reliability of the data. As a result, users are more confident in making decisions and taking actions based on the data.
运营影响
  • The time required to collect and analyze data was reduced from four hours per shift to less than 45 minutes.
  • The reduction in data collection time is equivalent to eliminating two half-time positions.
  • Staff were reassigned to more productive activities, increasing overall productivity.
数量效益
  • Data collection time reduced by 81%.

相关案例.

联系我们

欢迎与我们交流!

* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

Thank you for your message!
We will contact you soon.