下载PDF
Henkel's Successful Migration to Remote Work: A Digital Transformation Case Study
技术
- 网络安全和隐私 - 端点安全
- 基础设施即服务 (IaaS) - 混合云
适用行业
- 水泥
- 消费品
适用功能
- 物流运输
- 产品研发
用例
- 施工管理
- 人员跟踪与监控
服务
- 云规划/设计/实施服务
- 培训
挑战
推动增长,加速业务数字化,并加强与客户和消费者的关系。
客户
汉高
关于客户
Henkel AG & Co. KGaA ,俗称Henkel,是一家德国跨国化工和消费品公司,总部位于德国杜塞尔多夫。它活跃于消费和工业领域。
解决方案
Unisys Digital Workplace Services 提供 13 种语言的 24/7 支持,包括服务台、桌面管理和支持,以及在公司总部提供面对面技术支持、故障解决或建议的 Tec-Stop;支持 70 多个地点的 53,000 多个最终用户(每月总计约 35,000 个查询);云和基础设施服务,包括数据中心转换服务、端点安全服务和托管网络服务。
运营影响
数量效益
相关案例.
Case Study
Improving Vending Machine Profitability with the Internet of Things (IoT)
The vending industry is undergoing a sea change, taking advantage of new technologies to go beyond just delivering snacks to creating a new retail location. Intelligent vending machines can be found in many public locations as well as company facilities, selling different types of goods and services, including even computer accessories, gold bars, tickets, and office supplies. With increasing sophistication, they may also provide time- and location-based data pertaining to sales, inventory, and customer preferences. But at the end of the day, vending machine operators know greater profitability is driven by higher sales and lower operating costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Series Production with Lot-size-1 Flexibility
Nobilia manufactures customized fitted kitchens with a lot size of 1. They require maximum transparency of tracking design data and individual processing steps so that they can locate a particular piece of kitchen furniture in the sequence of processes.
Case Study
American Eagle Achieves LEED with GE LED Lighting Fixtures
American Eagle Outfitters (AEO) was in the process of building a new distribution center. The AEO facility management team decided to look at alternate options for lighting layout that could provide energy and maintenance savings. AEO would need a full-time maintenance employee just to replace burned-out fluorescent tubes.