下载PDF
How does this Pharmaceutical company streamline their procurement process for six different branches by using GoComet’s RFQ module?
技术
- 功能应用 - 企业资源规划系统 (ERP)
- 分析与建模 - 数据即服务
- 分析与建模 - 预测分析
适用行业
- 药品
适用功能
- 采购
- 商业运营
用例
- 供应链可见性(SCV)
- 数字线程
服务
- 系统集成
- 数据科学服务
挑战
With more than 6+ subsidiaries procuring rates at the same time, it was too difficult a process to manage everything via email and phone calls. They were looking for a platform that could bring all their existing procurement processes under one roof. They have been using Gocomet to address the following issues. Single Platform/Dashboard: Spot procurement for different groups of companies were done manually and so they were in need of a single dashboard to track it all. Cross-division approval: Interaction and Interoperability within teams was limited with respect to the Approval process. Multi-level hierarchy-based approval systems were a requirement. Transparency in Auditing: Manual checks were only possible resulting in a lot of irregularities. Choosing the best quotes: Comparing the price and service level quotations from vendors was a very demanding challenge. Digitalization for better efficiency: Current physical processes were tiring and time-consuming. A shift towards automation was mandatory.
关于客户
This pharmaceutical company with headquarters in Mumbai has a presence in over 100 countries. They provide empty hard pharmaceutical capsules, encapsulation machinery, tablet coating systems, tablet compression systems, fluid bed equipment, tablet tooling and performance enhancers along with online and inline analytical and inspection systems. The company also provides blister packing, high barrier packaging films, carton packing machines, camera inspection systems, candy-wrapping machines, and end-of-line case packers. They have about 4,500 employees and are one of the leading manufacturers of empty hard-shell capsules. This group also offers manufacturing, packaging, research, and development services for the pharmaceutical industry.
解决方案
The company implemented GoComet's RFQ module to streamline their procurement processes. The solution provided a single platform/dashboard to manage spot procurement for different groups of companies, which was previously done manually. This platform allowed for cross-division approval, enhancing interaction and interoperability within teams. The multi-level hierarchy-based approval system met their requirements for a more structured approval process. Transparency in auditing was achieved by replacing manual checks with automated systems, reducing irregularities. The platform also facilitated the comparison of price and service level quotations from vendors, making the process less demanding. Digitalization of the procurement process improved efficiency, replacing tiring and time-consuming physical processes with automated ones.
运营影响
数量效益
相关案例.
Case Study
Case Study: Pfizer
Pfizer’s high-performance computing software and systems for worldwide research and development support large-scale data analysis, research projects, clinical analytics, and modeling. Pfizer’s computing services are used across the spectrum of research and development efforts, from the deep biological understanding of disease to the design of safe, efficacious therapeutic agents.
Case Study
Fusion Middleware Integration on Cloud for Pharma Major
Customer wanted a real-time, seamless, cloud based integration between the existing on premise and cloud based application using SOA technology on Oracle Fusion Middleware Platform, a Contingent Worker Solution to collect, track, manage and report information for on-boarding, maintenance and off-boarding of contingent workers using a streamlined and Integrated business process, and streamlining of integration to the back-end systems and multiple SaaS applications.
Case Study
Process Control System Support
In many automated production facilities, changes are made to SIMATIC PCS 7 projects on a daily basis, with individual processes often optimised by multiple workers due to shift changes. Documentation is key here, as this keeps workers informed about why a change was made. Furthermore, SIMATIC PCS 7 installations are generally used in locations where documentation is required for audits and certification. The ability to track changes between two software projects is not only an invaluable aid during shift changes, but also when searching for errors or optimising a PCS 7 installation. Every change made to the system is labour-intensive and time-consuming. Moreover, there is also the risk that errors may occur. If a change is saved in the project, then the old version is lost unless a backup copy was created in advance. If no backup was created, it will no longer be possible to return to the previous state if and when programming errors occur. Each backup denotes a version used by the SIMATIC PCS 7 system to operate an installation. To correctly interpret a version, information is required on WHO changed WHAT, WHERE, WHEN and WHY: - Who created the version/who is responsible for the version? - Who released the version? - What was changed in the version i.e. in which block or module of the SIMATIC PCS 7 installation were the changes made? - When was the version created? Is this the latest version or is there a more recent version? - Why were the changes made to the version? If they are part of a regular maintenance cycle, then is the aim to fix an error or to improve production processes? - Is this particular version also the version currently being used in production? The fact that SIMATIC PCS 7 projects use extremely large quantities of data complicates the situation even further, and it can take a long time to load and save information as a result. Without a sustainable strategy for operating a SIMATIC PCS 7 installation, searching for the right software version can become extremely time-consuming and the installation may run inefficiently as a result.
Case Study
Drug Maker Takes the Right Prescription
China Pharm decided to build a cloud-based platform to support the requirements of IT planning for the next five to ten years which includes a dynamic and scalable mail resource pool platform. The platform needed to have the following functions: all nodes support redundancy, ensuring service continuity and good user experience, simple and easy-to-use user interfaces for end users and administrators and good compatibility and supports smooth capacity expansion.
Case Study
ELI LILLY ADOPTS MICROMEDIA’S ALERT NOTIFICATION SYSTEM
Pharmaceutical production is subject to a strict set of enforced rules that must be adhered to and compliance to these standards is critically necessary. Due to the efforts of WIN 911’s strategic partner Micromedia, Lilly was able to adopt an alarm notification infrastructure that integrated smoothly with their existing workflows and emergency hardware and protocols. These raw energy sources enable the industrial process to function: electricity, WIN-911 Software | 4020 South Industrial Drive, Suite 120 | Austin, TX 78744 USA industrial steam, iced water, air mixtures of varying quality. Refrigeration towers, boilers and wastewater are monitored by ALERT. Eli Lilly identified 15000 potential variables, but limitations compelled them to chisel the variable list down to 300. This allowed all major alarms to be covered including pressure, discharge, quantity of waste water discharged,temperature, carbon dioxide content, oxygen & sulphur content, and the water’s pH.