下载PDF
Hybrid Cloud Gives RWDI the Elasticity and Capacity to Respond to Revenue-Generating Opportunities
技术
- 基础设施即服务 (IaaS) - 云计算
- 基础设施即服务 (IaaS) - 混合云
适用行业
- 建筑与基础设施
- 公用事业
适用功能
- 离散制造
- 产品研发
用例
- 预测性维护
- 过程控制与优化
服务
- 云规划/设计/实施服务
- 系统集成
挑战
RWDI, a multidisciplinary engineering consulting firm, was facing a challenge due to its business growth. They had outgrown their on-premises High Performance Computing (HPC) environment and needed a solution that could handle their increasing workload. They had recently won a large wind speed mapping project across the Middle East, which required analyzing 30 years of atmospheric data across the entire region in two months. This required a million core-hours, significantly more than their on-premises system capacity. Due to the short project timeline, expanding their on-premises HPC was not feasible. Building out their own software and middleware infrastructure to be able to burst to the public cloud on their own was also not an option. They needed a turnkey hybrid cloud solution to expand their existing capacity.
关于客户
RWDI is a multidisciplinary engineering consulting firm that specializes in the built and natural environments. They perform a wide range of engineering studies in domains including air quality, climate analytics, energy and water modeling, meteorology, structural dynamics, ventilation, and wind engineering services. They have worked on some of the world’s most notable structures such as the London Millennium Bridge, the Petronas Towers in Malaysia, the Freedom Tower on the World Trade Center site, the second span of the Tacoma Narrows Bridge, the Taipei 101 tower, and the mega-skyscraper, Burj Khalifa, currently the world’s tallest building. RWDI is diversified geographically as well, with global operations spanning China, Australia, the Middle East, Europe, the United States, and their corporate headquarters in Canada.
解决方案
RWDI chose Rescale as it offered the most seamless on-premises/cloud integration that provided the most consistent front-end user experience for their engineers, a wide variety of multi-cloud hardware including the high-performance instance types that RWDI required, and excellent customer service from the Rescale technical team. To minimize disruption to RWDI’s engineering process, Rescale set up a back-end integration with RWDI’s on-premises scheduler. To run on Rescale, engineers simply submit jobs to the cloud by adding a few simple command lines into the submit script. It is a minimal change to their existing workflow that allows engineers to dramatically increase their simulation throughput without disruption. RWDI had specific speed and performance requirements. Choosing from a wide selection of hardware architectures from a variety of major cloud service providers and specialty supercomputing centers, Rescale advised RWDI to run on Rescale’s core type Magnesium, a high-performance architecture with high-speed interconnect.
运营影响
数量效益
相关案例.
Case Study
IoT Solutions for Smart City | Internet of Things Case Study
There were several challenges faced: It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance. The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.
Case Study
Automation of the Oguz-Gabala-Baku water pipeline, Azerbaijan
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”
Case Study
GPRS Mobile Network for Smart Metering
Around the world, the electricity supply industry is turning to ‘smart’ meters to lower costs, reduce emissions and improve the management of customer supplies. Smart meters collect detailed consumption information and using this feedback consumers can better understand their energy usage which in turn enables them to modify their consumption to save money and help to cut carbon emissions. A smart meter can be defined in many ways, but generally includes an element of two-way communication between the household meter and the utility provider to efficiently collect detailed energy usage data. Some implementations include consumer feedback beyond the energy bill to include online web data, SMS text messages or an information display in consumers’ premises. Providing a cost-effective, reliable communications mechanism is one of the most challenging aspects of a smart meter implementation. In New Zealand, the utilities have embraced smart metering and designed cost effective ways for it to be implemented. The New Zealand government has encouraged such a move to smart metering by ensuring the energy legislation is consistent with the delivery of benefits to the consumer while allowing innovation in this area. On the ground, AMS is a leader in the deployment of smart metering and associated services. Several of New Zealand’s energy retailers were looking for smart metering services for their residential and small business customers which will eventually account for over 500,000 meters when the multi-year national deployment program is concluded. To respond to these requirements, AMS needed to put together a solution that included data communications between each meter and the central data collection point and the solution proposed by Vodafone satisfied that requirement.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
NB-IoT connected smart meters to improve gas metering in Shenzhen
Shenzhen Gas has a large fleet of existing gas meters, which are installed in a variety of hard to reach locations, such as indoors and underground, meaning that existing communications networks have struggled to maintain connectivity with all meters. The meter success rate is low, data transmissions are so far unstable and power consumption is too high. Against this background, Shenzhen Gas, China Telecom, Huawei, and Goldcard have jointly trialed NB-IoT gas meters to try and solve some of the challenges that the industry faces with today’s smart gas meters.
Case Study
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs