下载PDF
Leveraging IoT for COVID-19 Treatment Development: A Case Study of MKS Instruments and Altium 365
技术
- 基础设施即服务 (IaaS) - 云数据库
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 电子产品
- 设备与机械
适用功能
- 产品研发
用例
- 远程协作
服务
- 硬件设计与工程服务
挑战
MKS Instruments 是一家领先的质谱仪和实验室设备供应商,在 COVID-19 大流行期间面临着远程工作和维护基本设备的挑战。
关于客户
MKS Instruments 是生命科学行业的知名公司,年收入超过 1.8 亿美元,拥有 2,500 多项专利。他们为制药和生物制药行业提供必要的技术。
解决方案
MKS Instruments 实施了 Altium 365,这是一个用于印刷电路板设计和实现的基于云的平台,以实现远程工作并简化电气和机械工程师之间的协作。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Remote Temperature Monitoring of Perishable Goods Saves Money
RMONI was facing temperature monitoring challenges in a cold chain business. A cold chain must be established and maintained to ensure goods have been properly refrigerated during every step of the process, making temperature monitoring a critical business function. Manual registration practice can be very costly, labor intensive and prone to mistakes.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.