下载PDF
Maximize Fastening Tool Effectiveness and Save Money with Manufacturing Execution System Control
技术
- 功能应用 - 制造执行系统 (MES)
适用行业
- 设备与机械
适用功能
- 离散制造
用例
- 过程控制与优化
挑战
鉴于市场上有大量制造紧固工具和装配线设备产品,确定您应该购买哪些产品可能会变得非常困难;根据顾问或工具供应商自己的建议。由于声称具有附加功能和好处,是否值得花“额外的钱”?问题是,完成任务你真正需要的是什么?如果您可以购买工作“需要”的最基本或最具成本效益的工具,并节省资金用于您真正需要的整体制造执行系统 (MES) 解决方案,该怎么办?事实证明,紧固工具工艺是制造商改进其现有制造操作(升级)或新项目规范的主要目标应用;请考虑以下事项。
客户
未公开
关于客户
批处理或离散制造,包括重型机械、农业、汽车、航空航天、动力运动车辆等行业。
解决方案
MES 或 MOM 系统是从接收(监控)的所有制造数据中破译和创建操作的核心,以便相应地实时采取行动(控制和警报),并输出制造的粒度或安灯数据,对于最大化质量和生产输出 (OEE) 以及优化工艺步骤周期时间至关重要。因此,正如经过验证和推荐的那样,将 MES 系统视为您改进制造流程计划的主要重点,并作为您新项目的起点;因为您连接到网络的工具和设备在事物的整体制造优化范围内是次要的;紧固工具的基本目的是接受输入并将输出传输到 MES,这是制造执行系统验证和指挥流程所需的重要数据。值得注意的是,无需为紧固工具上不需要的功能花费额外的钱,因为只要紧固工具具有内置传感器,它就可以通过开放协议非常有效地配对以与 MES 通信,以确保防错紧固操作永远不会受到影响。
收集的数据
Cycle Times, Process Parameters
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.