下载PDF
Micron's Rapid Data Warehouse Solutions Through IoT
技术
- 功能应用 - 企业资源规划系统 (ERP)
- 功能应用 - 仓库管理系统 (WMS)
适用行业
- 水泥
适用功能
- 仓库和库存管理
用例
- 添加剂制造
- 拣选/分拣/定位
服务
- 数据科学服务
挑战
美光努力在足够快的时间内准备和提取来自 12 个不同站点的制造大数据,以生成有意义、及时和全公司范围的商业智能。鉴于无法在请求的时间范围内交付数据,许多站点都是自助服务并试图直接访问 OLTP 数据,从而导致流程冗余、资源效率低下以及数据集成和性能问题。
确实发生的项目是“一次性的”,无法在需要时进行构建或修改。简而言之,开发的数据仓库和分析解决方案无法满足业务需求。
客户
美光科技
关于客户
35 多年来,美光科技的梦想家、远见者和科学家团队重新定义了创新——设计和构建了一些世界上最先进的内存和半导体技术。美光拥有 20,000 多项专利并提供业内最广泛的内存解决方案组合,不断改变世界使用信息的方式。
解决方案
为了应对这些挑战,该公司使用 WhereScape® 自动化设计和构建了一个企业 Data Vault,利用了 Teradata 上的 Data Vault 2.0 方法。通过专门为利用 Teradata 的本机功能而构建的自动化,美光在 90 天内为其新的企业数据保险库奠定了基础。
此外,美光团队现在能够在一小时内生产出新原型,可用于在将解决方案投入生产之前与业务用户一起评估有效性。美光现在可以快速访问企业范围内的制造大数据视图,并能够响应最终用户的查询并在同一天提供所请求的数据。
运营影响
数量效益
相关案例.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Digital Transformation of Atlanta Grout & Tile: An IoT Case Study
Atlanta Grout & Tile, a Tile, Stone & Grout restoration company based in Woodstock, Georgia, was facing challenges with its traditional business model. Despite steady growth over the years, the company was falling behind the web revolution and missing out on the opportunity to tap into a new consumer base. They were using independent software from different vendors for each of their department information and workforce management. This resulted in a lot of manual work on excel and the need to export/import data between different systems. This not only increased overhead costs but also slowed down their response to clients. The company also had to prepare numerous reports manually and lacked access to customer trends for effective business decision-making.
Case Study
Revolutionizing Construction Equipment Rental: A Case Study on ProsRent and ENO8
ProsRent, a startup that won the 'Best Financial Opportunity' and 'Best Pitch' at CodeLaunch 2016, aimed to revolutionize the way construction professionals source and rent heavy equipment. In the construction industry, project managers and contractors typically rent heavy equipment from supply companies. However, predicting inventory can be challenging, and finding the required equipment at the right time and place can be a hassle. If the preferred vendor doesn't have the required equipment, it results in wasted time and money in searching for it, often leading to higher costs due to non-preferred rates and increased delivery costs if the vendor is located far from the job site. Suppliers, on the other hand, desired access to a wider base of trusted renters that they didn't have to vet themselves and wanted to offer dynamic rental pricing based on demand and availability in their market. ProsRent's challenge was to produce a minimum viable product that was fast and first to market but also strong enough to engender loyalty and repeat business from the target market.
Case Study
IoT Solution Enhances Comfort and Energy Efficiency at Apple Valley Commons Office
Apple Valley Commons, a mixed-use office complex built in 1986, was facing significant comfort and energy efficiency challenges. The building, which houses a variety of businesses, was experiencing extreme temperature imbalances, causing discomfort to employees and clients. Despite outdoor temperatures being consistently high during summers, occupants had to use space heaters to keep warm. The electricity bills from the constant operation of the heat pump were exorbitant. The building's elevator room on the roof was also overheating, reaching temperatures of 130 to 140 degrees, causing the elevator equipment to shut down. The building's existing controls solution did not provide a front end for diagnostics or remote control. The building management was seeking a solution that could address these temperature issues, improve occupant comfort, reduce operational costs, and increase building visibility.
Case Study
Revamping EE's Legacy ERP: A Case Study on BT's Strategic Transformation
EE, even after its merger with BT, was operating its ERP estate on legacy infrastructure, hosted on the premises of a third-party supplier. This outdated system resulted in a volume-based operational model, higher time to market, longer delivery cycles, and unsatisfactory customer experience. BT recognized the need for a strategic transformation of these aging ERP systems and sought a partner who could proactively manage application services. The partner was also expected to handle development requirements associated with application management services, drive accountability, and ownership with a time and target-driven transformation of these services. BT's primary goals were to improve customer experience, reduce cycle time, and measure these improvements with precision.