下载PDF
Orchestrating Intelligence: Creating the Smart Enterprise with Vantiq
技术
- 基础设施即服务 (IaaS) - 私有云
- 基础设施即服务 (IaaS) - 公共云
适用行业
- 水泥
- 设备与机械
用例
- 计算机视觉
- 实时定位系统 (RTLS)
服务
- 云规划/设计/实施服务
- 系统集成
挑战
近年来,随着云计算、大数据、人工智能、物联网的快速发展,智能楼宇正在成为建设和楼宇管理行业转型的重要推动力。无论是新建筑还是翻新建筑,市场噪音和对智能建筑技术的需求都是巨大的。
尽管智能建筑的发展潜力几乎是无限的,但智能建筑技术的渗透率仍然相对较低。
Bimernet,一家位于中国深圳的高科技公司,为AEC(Architecture, Engineering, and Construction)行业提供专业的BIM咨询服务,意识到智能建筑行业的巨大潜力和痛点,并开始寻找一种轻松的方式协调所有智能建筑系统。
客户
双子网
关于客户
Bimernet是一家位于中国深圳的高科技公司,在 AEC(建筑、工程和施工)领域提供专业的 BIM 咨询服务
解决方案
借助 Vantiq 的实时事件驱动应用程序开发平台,Bimernet 能够通过结合实时应用程序和数字孪生技术,将其 BIM 解决方案变为现实,从而更好地规划、设计、建造、运营和维护建筑物。 Vantiq 平台是该项目的唯一资格,因为它使 Bimernet 能够在创纪录的时间内开发具有以下属性的系统:
- 真正的 3D 建模使建筑物栩栩如生
- 实时技术协助楼宇管理
- 易应用集成解决行业痛点
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.