下载PDF
Remake Enterprise-to-production System
适用行业
- 塑料
适用功能
- 仓库和库存管理
用例
- 库存管理
挑战
客户正在运行一个旧的物料流跟踪系统,并希望用更有效的系统替换该系统,因为该系统的维护和支持成本越来越高,而且不可扩展。客户的 IT 环境充满了现代应用程序,很难将物流跟踪系统与现代应用程序连接起来。
客户
未公开
关于客户
该客户是全球领先的聚酯薄膜供应商之一,也是工业和电气市场中使用的聚酯薄膜的最大供应商之一。
解决方案
Cognizant 决定重新设计客户的现有架构。 Cognizant 基于.Net 平台开发了一个单一的计划和调度系统,包含复杂的业务规则。具有多层架构的 Cognizant 新解决方案确保了灵活、可扩展和可扩展的强大解决方案。软件组件 - .Net 平台
收集的数据
Inventory Levels, Material Tracking, Product Lifecycle
运营影响
相关案例.
Case Study
Plastic Spoons Case study: Injection Moulding
In order to meet customer expectations by supplying a wide variety of packaging units, from 36 to 1000 spoons per package, a new production and packaging line needed to be built. DeSter wanted to achieve higher production capacity, lower cycle time and a high degree of operator friendliness with this new production line.
Case Study
Boiler Control System for Plastic Manufacturing Applications
Factory automation applications must be equipped to handle and monitor the myriads of information from attached devices. For plastic manufacturing applications, the boiler control system plays a critical role by gathering and regulating information to ensure production is accurate and smooth. In this particular case, the customer combines eight subsystems that include power meters, water meters, alarm output, displays, and I/O status to be controlled by several intelligent controllers with Modbus RTU interface. The Modbus TCP protocol is used for this application due to the distance. System Requirements: • Modbus serial to Modbus TCP translation • Multiple slaves/masters support • Automatic Modbus TCP response time detection
Case Study
Ascend Performance Materials Case Study
Ascend operations must access multiple software systems to manage day-to-day operations in an effective and secure manner. These systems generate large sets of data which contain critical information pertaining to management systems, planning and cost information in business systems and energy consumption. As a result, Ascend management was challenged with creating relevant reports reflecting performance measures in overall context of their operational process. The company’s previous process entailed collecting and analyzing data manually which was not effective, since the information collected was generated after the fact, and was too complex for collaborative use across the organization.
Case Study
CK Technologies: Leveraging QAD Explore for Continuous Improvement
CK Technologies, a leading thermoplastics solutions provider in the North American commercial heavy truck market, faced a significant challenge in maintaining continuous improvement in their business practices. This was particularly difficult due to the nature of their low volume, high variability business. The company produces a wide variety of parts for multiple customers, supplies parts for current truck models, and also the service parts for past design versions. They are also one of the first companies in the industry to supply parts in body color for each customer, approximately 1,400 colors a year, which have to be perfectly sequenced for shipment. This complexity in their operations made it challenging to stay informed and inspired to accomplish continuous improvement.