下载PDF
Siemens' Efficient Data Management: A Case Study on Alteryx and Tableau Integration
技术
- 应用基础设施与中间件 - 数据库管理和存储
- 基础设施即服务 (IaaS) - 云计算
适用行业
- 水泥
- 设备与机械
适用功能
- 维护
用例
- 租赁金融自动化
- 时间敏感网络
服务
- 系统集成
挑战
西门子在 85 个国家/地区开展业务,整合整个公司的财务数据既复杂又耗时。他们依靠电子表格进行数据集成和分析,这很容易出错并且需要手动更新。
关于客户
西门子是一家拥有 380,000 名员工的全球性公司。他们需要一种解决方案来整合 85 个国家/地区运营的财务数据,并为生产率分析提供更快、更准确的报告。
解决方案
西门子采用 Alteryx 进行数据准备,并采用 Tableau 进行数据可视化。 Alteryx 工作流程用于连接多个数据源、转换数据并将其输出到 Tableau。工作流程托管在 Alteryx Server 上,并计划自动运行,直接从源中提取数据并将其发送到 Tableau Server。这一自动化过程显着减少了数据准备所需的时间和精力。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.