下载PDF
The Connected Enterprise Optimizes Facilities and Supplier Networks
技术
- 功能应用 - 远程监控系统
适用行业
- 设备与机械
适用功能
- 离散制造
用例
- 过程控制与优化
挑战
罗克韦尔希望为多样化的产品组合和各种制造流程实施灵活敏捷的全球 MES,并用跨越所有工厂的标准化系统取代单独的 ERP 系统和自定义应用程序。
客户
罗克韦尔自动化
关于客户
罗克韦尔自动化是一家美国工业自动化和信息产品供应商。品牌包括 Allen-Bradley 和 Rockwell Software,在全球拥有 22,000 多名员工。
解决方案
罗克韦尔自动化集成控制和信息产品组合,包括 FactoryTalk ProductionCentre 软件和 FactoryTalk VantagePoint 企业制造智能 (EMI) 软件,可实现通用制造平台、实时性能可见性和更好的决策。软件组件 - FactoryTalk ProductionCentre 软件 - FactoryTalk VantagePoint 企业制造智能 (EMI) 软件
收集的数据
Inventory Cycle Times, On-Time Delivery (OTD), Operating Cost, Production Efficiency, Supply Chain Optimization
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.