下载PDF
Transforming Manufacturing Operations: A Case Study of Kamco Industries
技术
- 功能应用 - 库存管理系统
- 网络与连接 - 射频识别
适用行业
- 设备与机械
- 运输
适用功能
- 物流运输
- 仓库和库存管理
用例
- 增强现实
- 拣选/分拣/定位
服务
- 系统集成
- 培训
挑战
当 Kamco Industries 基于电子表格的业务流程无法满足美国本田等主要客户的要求时,该公司知道需要改进。分析绩效涉及大量文书工作,年终结算过程需要无数小时的加班,需要数周才能完成。 IT 花费了太多时间来支持业务流程,而不是为公司提供强大的技术基础。为了满足客户的要求并提高效率,Kamco 开始寻找新的 ERP 系统。
客户
卡姆科工业
关于客户
Kamco Industries是 Kumi Kasei 的子公司,是产品设计和注塑、片材成型和成型纤维毡产品制造商的全方位服务提供商。该公司于 1987 年在俄亥俄州 West Unity 成立,通过其业务规划、ISO 14000 和 ISO 9001 计划为其客户和员工带来更多价值。 1997年扩展到安大略省布拉德福德后; 2000 年,阿拉巴马州克兰顿;和墨西哥瓜达拉哈拉,2010 年; Kumi North America 集团的年总销售额已超过 1.4 亿美元。
解决方案
获得库存控制和可见性
借助 Plex 中的周期盘点工具和实时库存可见性,Kamco 显着提高了其库存控制。
通过从电子表格过渡到 Plex,Kamco 将安排每个班次的工作任务的流程从两个小时缩短到了几分钟。运行更精简的流程使 Kamco 能够减少其整体库存持有量,这有助于提高利润。 Kamco 还简化了其年终盘点流程,该流程曾经需要数周才能完成,并且 Kamco 员工需要无休止地加班。
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.