下载PDF
Wireless Vibratory Data Acquisition System for Maintenance
技术
- 分析与建模 - 预测分析
- 基础设施即服务 (IaaS) - 其他
- 网络与连接 - 无线局域网
适用行业
- 设备与机械
适用功能
- 维护
用例
- 预测性维护
挑战
在其预测性维护产品的框架内,ACOEM 集团的 ONEPROD 部分提供监控解决方案,可以避免工业生产工具的意外故障。传统上,ONEPROD 使用有线数据采集系统。然而,它们成本高且难以安装在恶劣的环境或爆炸区域,例如石油和天然气以及采矿业。为了覆盖连接和为监控设备供电的距离,需要相当长的电缆,尤其是在难以进入的工业空间中。开发无线数据采集系统成为 ONEPROD 战略的关键成功因素,以避免任何布线问题并提高负责便携式措施的工作人员的安全性。
客户
ACOEM
关于客户
ACOEM 帮助工业、环境和国防领域的客户做出正确的决定并采取正确的行动。在世界各地,ACOEM 的 400 名员工处于监控、维护和工程创新的最前沿
解决方案
基于 HIKOB 技术和系统,ACOEM 推出了 ONEPROD EAGLE,这是一种新的智能在线解决方案,更高效且具有远程功能,可收集所有必需的数据以检测早期违约。解决方案中部署了传感器、无线数据采集网络和无线通信。软件组件 - HIKOB NET PULSE 应用程序
收集的数据
Maintenance Requirements
运营影响
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.