The Challenge
The toolmaking industry, particularly in Europe and America, has been facing increased pricing pressure due to growing competition from Asian countries. This has led to a need for innovative and high-quality solutions that offer higher productivity and significantly lower costs per part compared to standard solutions. One of the key parameters for higher productivity is the cycle time, which can be optimized through conformal tempering. However, the challenge lies in reducing cycle time without compromising on the quality of the parts produced. The shorter the cycle time, the greater the number of components that can be manufactured within the same period, significantly increasing the facility’s overall productivity and economic viability.
About The Customer
The customer in this case study is PROTIQ GmbH, a spin-off from Phoenix Contact's business unit, Rapid Solutions. PROTIQ specializes in the production of individual tools made of different materials and offers its solutions globally. The company not only produces 3D printed parts but also leverages topology optimization and simulation to design the tools. PROTIQ's approach ensures that only the necessary amount of material is used, leading to lower production costs and improved handling of the injection mold in operation. The company has a platform where customers can upload their digital 3D data, calculate the price online, and have the final component delivered in no time.
The Solution
To address this challenge, the industry has increasingly turned to new manufacturing methods such as 3D printing (or additive manufacturing). Phoenix Contact, a company in the industry, started to evaluate these methods in 2009, initially using a polyjet printer and later adopting laser-sintering (plastic) and laser melting (metal) solutions. The company’s business unit, Rapid Solutions, delivered fast toolmaking solutions and prototypes. This approach proved successful, leading to the creation of a separate enterprise within Phoenix Contact, named PROTIQ GmbH. PROTIQ leverages topology optimization and simulation to design the tools. Based on load case descriptions and other boundary conditions, engineers are able to determine the optimal structure of the component prior to production. This approach ensures that only the necessary amount of material is used, leading to lower production costs and improved handling of the injection mold in operation.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.