Download PDF
CERN Gets Reliable Data Access Down to a Science Using Terracotta
Technology Category
- Infrastructure as a Service (IaaS) - Cloud Computing
Applicable Functions
- Discrete Manufacturing
- Quality Assurance
Use Cases
- Predictive Maintenance
- Process Control & Optimization
Services
- System Integration
- Software Design & Engineering Services
The Challenge
Physicists at CERN conduct extensive experiments using particle accelerators. A variety of process visualization and control systems is used to monitor the equipment, including the TIM system and Diagnostics and Monitoring (DIAMON). TIM monitors around 120,000 sensors in such areas as building services engineering, while DIAMON monitors some of the equipment and IT components related to the particle accelerators. Technicians and engineers at the control stations have dashboards that show the status of the systems; the dashboards are continuously updated based on the data from the monitoring systems. It is, therefore, of the utmost importance to CERN to operate the monitoring platforms in the most fail-safe way possible. Because these systems play the role of a control center, unexpected occurrences, power outages and major accidents result in a large number of events. One of the requirements for the implementation was that the incoming data could be processed in less than one second. Even during the greatest peaks, the infrastructure must be stable enough to handle the large number of status messages and help the staff in the control center and engineers troubleshooting the systems.
About The Customer
CERN, the European Organization for Nuclear Research, is the world’s largest particle physics research center. Scientists from around the world conduct high-energy physics experiments at CERN using the Large Hadron Collider (LHC) particle accelerator and other equipment. Twenty member states and about 3,200 employees make it possible to analyze groundbreaking research projects on subjects such as the structure of matter. The organization operates a variety of process visualization and control systems to monitor the equipment, including the Technical Infrastructure Monitoring (TIM) system and Diagnostics and Monitoring (DIAMON).
The Solution
To achieve the necessary high level of availability and robustness, the CERN IT team developed the CERN Control and Monitoring Platform (C2MON), a redundant cluster solution for operating any monitoring platform. TIM and DIAMON are the first two systems to be implemented on the new high-availability solution. One of the central components of C2MON is Terracotta BigMemory, Software AG’s in-memory data fabric solution. Terracotta BigMemory provides a high-performance in-memory store that is shared by the cluster solution’s servers and reliably handles even the highest traffic. Terracotta provides distributed in-memory storage for the server systems in the cluster solution, which has been active since the beginning of 2012. Based on the C2MON architecture, the TIM and DIAMON platforms operated throughout 2012 without any significant downtime. The high performance of Terracotta’s in-memory solution also accelerated the overall system’s response times. In addition, CERN’s IT team is now able to add patches and new products to C2MON without interrupting central monitoring services.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Remote Monitoring & Predictive Maintenance App for a Solar Energy System
The maintenance & tracking of various modules was an overhead for the customer due to the huge labor costs involved. Being an advanced solar solutions provider, they wanted to ensure early detection of issues and provide the best-in-class customer experience. Hence they wanted to automate the whole process.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.