The Challenge
Consolidated Power Project (Pty) Ltd (CONCO), a South African energy company, was facing significant challenges in managing its operations. The company was struggling with manual-laden permission processes and reporting, particularly in areas with unreliable electrical and Internet infrastructure. This was a significant issue as CONCO's work involves designing and installing high-voltage power lines and substations in rural areas, where the danger of electrocution is always present. The company needed to ensure that employees were up-to-date on their certifications, which was a matter of life or death. Furthermore, the company was also dealing with the challenge of managing over 300 tenders a year using file servers and folders. Securing new projects required providing proof of the required certifications for any employees slated to do work, adding to the complexity of the process.
About The Customer
Consolidated Power Project (Pty) Ltd (CONCO) is an energy company based in South Africa. The company specializes in designing and installing high-voltage power lines and substations, particularly in rural areas. This work involves significant risks, including the danger of electrocution, making safety a top priority for the company. In addition to these operational challenges, CONCO also manages over 300 tenders a year, requiring a robust and efficient system for tracking and managing these projects. The company operates in areas with unreliable electrical and Internet infrastructure, adding to the complexity of its operations.
The Solution
To address these challenges, GT Consulting provided a hybrid solution using Nintex Workflow, Nintex Forms and Nintex Mobile on Microsoft SharePoint 2013 and Office 365 platforms. This solution was chosen due to its ease of use, visual interface, and high value. The solution was deployed on-premises and through Nintex Mobile to cater to areas with limited connectivity. GT Consulting helped CONCO rebuild project forms with Nintex Forms that automatically generate metadata, enabling CONCO’s staff to easily search the more than 300 current tenders and hundreds of past projects. To encourage employee adoption of the new system, CONCO introduced a lunch ordering system through SharePoint. Employees were given a lunch allowance and the ability to have their orders automatically deducted from their paychecks, but they had to order it through SharePoint. This strategy was successful in getting employees to use the new system.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Hydro One Leads the Way In Smart Meter Development
In 2010, Ontario’s energy board mandated that time-of-use (TOU) pricing for consumers be available for all consumers on a regulated price plan. To meet this requirement, Hydro One needed to quickly deploy a smart meter and intelligent communications network solution to meet the provincial government’s requirement at a low cost. The network needed to cover Hydro One’s expansive service territory, which has a land mass twice the size of Texas, and its customers live in a mix of urban, rural, and remote areas, some places only accessible by air, rail, boat or snowmobile. Most importantly, the network needed to enable future enterprise-wide business efficiencies, modernization of distribution infrastructure and enhanced customer service. To meet these needs, Hydro One conceptualized an end-to-end solution leveraging open standards and Internet Protocols (IP) at all communication levels. The utility drew upon industry leaders like Trilliant to realize this vision.
Case Study
Selling more with Whirlpool
Whirlpool wanted to add connectivity to appliances and transform the company's relationship with customers. Traditionally, Whirlpool interaction with customers was limited to purchases made once every ten years. Connected washer and dryers provide exciting new features like remote management of start times and inter-machine communication.
Case Study
SAS® Analytics for IoT: Smart Grid
Companies face falling revenues, rising infrastructure costs, and increasing risk of outages caused by inconsistent energy production from renewable sources. Less money is coming in as more people and organizations take steps to curb their energy use. Utilities are paying more to maintain and build infrastructure due to increasing complexity, resulting from the rising number of intermittent and variable renewable energy sources connected in the distribution grid.
Case Study
Enel Secures Italian Power Generation Network
Electric energy operators around the world are working to increase the reliability and cyber resiliency of their systems. This includes Enel, a global power company that manages and monitors the Italian power grid. This grid:• Serves 31 million customers• Has a net installed energy capacity exceeding 31 gigawatts• Includes more than 500 power generation plants,including hydroelectric, thermoelectric, and wind• Is managed and monitored by Enel 24/7/365• Is operated by Terna, the Italian Transmission System Operator (TSO)Enel is responsible for the availability of the grid’s underlying ICS and industrial network. It also manages Regional Control Centers and Interconnection Centers which connect with the TSO. The TSO manages the flow of energy to the grid plus controls and remotely regulates the power generation of power plants, increasing and decreasing power production as required. The complex system of interaction and cooperation between Enel and the TSO has strong security implications as well as operational and business challenges.
Case Study
Vodafone Hosted On AWS
Vodafone found that traffic for the applications peak during the four-month period when the international cricket season is at its height in Australia. During the 2011/2012 cricket season, 700,000 consumers downloaded the Cricket Live Australia application. Vodafone needed to be able to meet customer demand, but didn’t want to invest in additional resources that would be underutilized during cricket’s off-season.