Download PDF
Green MV switchgear advances Renault Group’s goal of a more sustainable future
Technology Category
- Infrastructure as a Service (IaaS) - Cloud Computing
Applicable Industries
- Automotive
Applicable Functions
- Discrete Manufacturing
- Maintenance
Use Cases
- Factory Operations Visibility & Intelligence
- Predictive Maintenance
Services
- System Integration
- Training
The Challenge
Renault Group, a multinational automobile manufacturer, is transforming its Flins, France factory into the first European circular economy plant dedicated to mobility. The goal is to achieve a negative CO2 balance at the plant by 2030. However, the company faces challenges such as power reliability and cybersecurity. Any power supply failure can cause a major critical event that can have serious consequences for the site’s activity. An outage can cause safety risks, halt the manufacturing process, which can lead to vehicle damage, cause financial losses due to the vehicle damage, and result in late deliveries to customers. In addition, Renault Group must focus on improving cybersecurity because a cyber breach could be devastating to the Flins factory’s operations.
About The Customer
Renault Group is a multinational automobile manufacturer and a pioneer in the automotive sector’s circular economy. In 2000, Renault Group began incorporating the circular economy approach into organization-wide activities with the aim of turning the company’s waste into resources. The French automaker is part of the Nissan Mitsubishi Alliance, which has over 150,000 employees and in 2021 produced 2.7 million vehicles at production sites worldwide. The Alliance is aligned with Renault Group’s commitment to sustainability and has the shared mission to make mobility sustainable and accessible to everyone, everywhere in the world.
The Solution
Renault Group chose SM AirSeT MV switchgear as one way to decrease the greenhouse gas inventory in Refactory. The switchgear is an innovative technology that combines Shunt Vacuum Interruption (SVI), pure air insulation, and digital technology for optimal environmental gains and maximum operational efficiency. SM AirSeT is installed in Refactory’s emergency backup network power supply loop, which mainly supplies two industrial buildings and a tertiary building. Besides the environmental benefits of avoiding greenhouse or alternative gases in Refactory’s electrical network, SM AirSeT simplifies the dismantling of its installations and facilitates cost-effective handling. The use of pure air completely removes the need for costly and complex gas recycling at the end of life of the MV equipment and thus lowers the total cost of ownership of the installation.
Operational Impact
Related Case Studies.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).
Case Study
Monitoring of Pressure Pumps in Automotive Industry
A large German/American producer of auto parts uses high-pressure pumps to deburr machined parts as a part of its production and quality check process. They decided to monitor these pumps to make sure they work properly and that they can see any indications leading to a potential failure before it affects their process.