Download PDF
Rapid Chip Design in the Cloud: Annapurna Labs' Journey with Altair Accelerator
Technology Category
- Analytics & Modeling - Machine Learning
- Application Infrastructure & Middleware - Data Exchange & Integration
Applicable Industries
- Buildings
- Construction & Infrastructure
Applicable Functions
- Product Research & Development
Use Cases
- Demand Planning & Forecasting
- Time Sensitive Networking
Services
- Cloud Planning, Design & Implementation Services
- System Integration
The Challenge
Annapurna Labs, a fabless chip start-up acquired by Amazon Web Services (AWS), was facing challenges in managing workloads on dedicated Amazon Elastic Compute Cloud (EC2) instances. The team could occasionally scale up by manually adding new On-Demand instances, but the process was not automated, leading to inefficiency, forgotten unused compute resources, and either under-scaling or excessive scaling. As a chip design company, time-to-market and engineering efficiency were critical metrics for them. The team needed a solution that could add structure and efficiency to scaling AWS compute resources, shorten time to results, and change the development model to Continuous Integration.
About The Customer
Annapurna Labs was established as a fabless chip start-up in 2011, with a focus on bringing innovation to the fast-growing cloud infrastructure. Four years later, it was acquired by Amazon Web Services (AWS). Since then, Annapurna Labs has accelerated its innovation and developed a number of products that benefit cloud customers, including AWS Nitro technology, Inferentia custom Machine Learning chips, and AWS Graviton2 processors, based on the 64-bit Arm Neoverse architecture purpose-built cloud server.
The Solution
Annapurna Labs selected the Altair Accelerator™ job scheduler for their front-end and back-end workflows. The Accelerator's Rapid Scaling feature, developed with Annapurna Labs, automatically starts new instances only when there is demand and stops scaling up if the speed at which demand is being processed is good enough. This license-first approach to scheduling allows Accelerator to efficiently differentiate workloads waiting for licenses versus workloads waiting for hardware. Many features were added in cooperation with Annapurna Labs, including configurable selection of instance type, Spot Instance support, protection against various errors, fine control of the number of jobs that can be executed on each new instance, and many others. Rapid Scaling also understands how to select a backup instance type if the first choice is not available.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Intelligent Building Automation System and Energy Saving Solution
One of the most difficult problems facing the world is conserving energy in buildings. However, it is not easy to have a cost-effective solution to reduce energy usage in a building. One solution for saving energy is to implement an intelligent building automation system (BAS) which can be controlled according to its schedule. In Indonesia a large university with a five floor building and 22 classrooms wanted to save the amount of energy being used.
Case Study
Powering Smart Home Automation solutions with IoT for Energy conservation
Many industry leaders that offer Smart Energy Management products & solutions face challenges including:How to build a scalable platform that can automatically scale-up to on-board ‘n’ number of Smart home devicesData security, solution availability, and reliability are the other critical factors to deal withHow to create a robust common IoT platform that handles any kind of smart devicesHow to enable data management capabilities that would help in intelligent decision-making
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.