The Challenge
VSE Corporation, a diversified government contractor, was facing challenges in managing the business side of its large-scale projects. The company was struggling with real-time data gathering for current project analysis, which hindered its understanding of the financial status of ongoing projects. This delay in data gathering and analysis led to incorrect invoicing and backlog tracking, causing payment delays from customers. If a project stalled and did not complete on time and on budget, it could have significant consequences for VSE and other government contractors. The company also needed to effectively handle labor utilization and risk assessment to ensure employees were as chargeable as possible and there was financial support for unplanned projects. VSE's previous Business Intelligence capabilities were complex, inflexible, and failed to provide a standardized view of data.
About The Customer
VSE Corporation is a broadly diversified government contractor company that focuses on creating, sustaining, and improving the systems, equipment, and processes of the U.S. Government. Established in 1959, VSE's mission is to provide engineering and technical support services to reduce the cost and improve the reliability of Department of Defense systems and equipment. As a government contractor, VSE handles numerous large-scale projects, making cost point analysis crucial for the company. Managing the business side of projects requires the ability to effectively control finances, labor utilization, and risk assessments. The company operates in the United States.
The Solution
VSE Corporation deployed Deltek Costpoint Analytics, Powered by QlikView, to 150 employees in less than four weeks. This solution allowed VSE to analyze Revenue, Profit, Backlog, and Labor Utilization, adding features such as HR Analytics. With QlikView Server (64-bit) and QlikView, VSE easily supports security and visibility while handling the large data volume of nearly 100 million records. The company implemented the solution in a series of phases. Initially, 25 users within VSE purchased the product in various departments such as IT, Finance, and Operations. The goal of phase one was to include senior management in deployment from the beginning. VSE wanted to ensure its senior executives would be able to use the solution without complications.
Operational Impact
Related Case Studies.
Case Study
Remote Monitoring & Predictive Maintenance App for a Solar Energy System
The maintenance & tracking of various modules was an overhead for the customer due to the huge labor costs involved. Being an advanced solar solutions provider, they wanted to ensure early detection of issues and provide the best-in-class customer experience. Hence they wanted to automate the whole process.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).
Case Study
Hospital Inventory Management
The hospital supply chain team is responsible for ensuring that the right medical supplies are readily available to clinicians when and where needed, and to do so in the most efficient manner possible. However, many of the systems and processes in use at the cancer center for supply chain management were not best suited to support these goals. Barcoding technology, a commonly used method for inventory management of medical supplies, is labor intensive, time consuming, does not provide real-time visibility into inventory levels and can be prone to error. Consequently, the lack of accurate and real-time visibility into inventory levels across multiple supply rooms in multiple hospital facilities creates additional inefficiency in the system causing over-ordering, hoarding, and wasted supplies. Other sources of waste and cost were also identified as candidates for improvement. Existing systems and processes did not provide adequate security for high-cost inventory within the hospital, which was another driver of cost. A lack of visibility into expiration dates for supplies resulted in supplies being wasted due to past expiry dates. Storage of supplies was also a key consideration given the location of the cancer center’s facilities in a dense urban setting, where space is always at a premium. In order to address the challenges outlined above, the hospital sought a solution that would provide real-time inventory information with high levels of accuracy, reduce the level of manual effort required and enable data driven decision making to ensure that the right supplies were readily available to clinicians in the right location at the right time.
Case Study
Asset Management and Predictive Maintenance
The customer prides itself on excellent engineering and customer centric philosophy, allowing its customer’s minds to be at ease and not worry about machine failure. They can easily deliver the excellent maintenance services to their customers, but there are some processes that can be automated to deliver less downtime for the customer and more efficient maintenance schedules.